What the designation check is actually worth
It is unusual for a single mapping check to have a direct and quantifiable effect on the size of a room, but on a Hornsey kitchen extension it does. Outside a conservation area, two routes are open. Class A permits a single-storey rear extension to a set depth without any application. Beyond that, the prior approval procedure permits a materially deeper one: you notify the council, adjoining neighbours are consulted, and if none objects the work proceeds — a lighter, faster and more predictable process than a full application, and the mechanism most homeowners use to get a genuinely generous kitchen. Inside a conservation area, both change. The Class A allowance is reduced, and prior approval is not available at all on designated land. The extra depth does not become impossible, but it stops being a notification and becomes an argument, justified on daylight, outlook and the established rear building line, with a determination period in the programme. Neither position is better or worse in principle — plenty of excellent extensions are built on designated addresses — but they are different projects with different timescales and different achievable depths, and knowing which one you are on before commissioning design work is what stops a scheme being drawn twice. It takes a morning against Haringey’s current conservation mapping.