The short answer
What is a full architectural service?
A full architectural service takes a project through every RIBA Plan of Work stage — briefing, concept design, planning, technical design, tender and construction — under one accountable team. Rather than appointing stage by stage, you get continuity, coordination of consultants and single-point oversight from first brief to handover, which protects design quality and keeps a project on track.
A project, properly led
The RIBA Plan of Work organises a project into clear stages: strategic definition, preparation and briefing, concept design, spatial coordination, technical design, manufacturing and construction, and handover. A full service runs across all of them, so each stage is properly resolved before the next begins and one team holds the whole picture — the brief, the design, the approvals, the consultants and the build — rather than handing it off in fragments.
Why continuity matters in prime London
On constrained, high-value London projects, the cost of gaps between stages is high: a design that ignores planning reality, technical drawings that lose the design intent, or a build that drifts from what was approved and priced. A full service closes those gaps. We brief, design, secure approvals, produce coordinated technical information, run the tender, and support construction — including contract administration where we are appointed and insured for it.
Stage by stage, what you get
A full service delivers something tangible at each RIBA stage. Feasibility and briefing establish what is wanted and what the property allows; concept design develops the idea into tested options; the planning stage secures permission; technical design produces the coordinated building regulations and construction information; and the construction stage takes the project through tender, the build and handover. Knowing what each stage produces — and that it is resolved before the next begins — is what makes a full service predictable rather than a leap of faith.
One point of responsibility
The quiet value of a full service is that one accountable team holds the whole project. We coordinate the structural engineer, the energy assessor, the surveyor and any specialists, so the consultants’ information lines up and you are not left mediating between advisers who have never spoken. Instead of managing a series of disconnected appointments, you have a single relationship and a single point of responsibility for how the parts fit together — which is exactly where complex London projects tend to succeed or unravel.
Tailoring the service to your project
A full service does not have to mean an all-or-nothing commitment. Because the work follows the RIBA stages, the appointment can too: many clients engage us through planning and then decide on the construction stages once permission is secured, while others want us from first sketch to final handover. We agree the scope and the basis of our fee stage by stage, so the service fits the project and your appetite rather than forcing a single template onto every commission.
What “full service” covers stage by stage
In plain terms: we help define the brief and test feasibility; develop concept options; prepare the planning or freeholder packages needed; produce technical design and building regulations information; run or support tender; and remain involved through construction for design integrity. Not every client needs every stage at full intensity — some stop after planning — but a full appointment keeps one design story from first sketch to handover.
Consultants (structure, energy, heritage, party wall) are coordinated against that single story so you are not managing a fragmented team alone.
When a staged appointment is smarter
If you only need to know whether an extension is realistic, start with a route review or feasibility. If permission already exists, start at technical design. Full service is best when you want continuity on a complex home project — multiple consents, heritage constraints, or a high specification — and value one accountable lead. We map the right entry stage to your actual question so fees match risk.
Fixed fees are agreed per stage in writing. See our packages page for published drawing-stage fees and ask for a whole-project fee plan once the brief is clear.
Quality control from design to site
The risk on long residential projects is design drift: planning drawings say one thing, the tender another, and site decisions a third. Full service reduces that drift by keeping the same team responsible for coordination, specification clarity and responses to site conditions. It is not a guarantee of build cost or programme — those sit with the contractor and market conditions — but it is the structure that protects design intent when pressure rises on site.
We are transparent about what full service is not: continuous clerk-of-works supervision, cost guarantee, or planning outcome guarantee.
The consents that run on their own clocks
Planning permission is one approval among several, and the others keep their own timetables. A householder or minor application carries a statutory target of around eight weeks from validation, major applications around thirteen, but that period governs the planning decision alone. Building regulations are assessed under a separate regime against the Approved Documents covering structure, fire safety, ventilation, stairs and guarding, energy, overheating and electrical work, so a scheme can hold permission while its construction detail is still unresolved. Party wall notices run statutory periods of one or two months depending on which notice is served. Where a permission arrives with pre-commencement conditions, those must be cleared before work can lawfully start.
Holding those clocks in the right order is a large part of what a full service quietly does. Technical drawings are prepared so the building control submission and the approved scheme describe the same building rather than two versions of it. Party wall notices go out early enough that their periods run alongside tender instead of after it. And the conditions on a decision notice are read the week it lands, because discharging a pre-commencement condition on materials or drainage is a fresh application with its own wait, and the thing that moves is usually a start date somebody fixed in the diary months earlier.
When the building is shared with other owners
Alongside the statutory consents sits a private layer with no statutory clock at all. A flat or maisonette has none of the permitted development rights a house enjoys, so alterations that would go unremarked in a terrace need an application. The lease usually governs anything structural, anything touching services or common parts, and often any change to the position of wet rooms, and the freeholder's consent takes the form of a licence to alter negotiated through their surveyor and solicitor. Estates and mansion blocks often add their own rules on materials, windows and working hours, and estate or freeholder consent can require its own drawings; the building's insurers may need telling too.
Because none of this runs to a published timetable, it is the layer most likely to strand an otherwise well-run project. We treat it as a stage in its own right rather than an afterthought: establishing early what the lease actually permits, preparing the licence to alter drawings a freeholder's surveyor needs to assess rather than the ones a planning officer wants, and running the two consents side by side so they are not queued end to end. Where works reach a party structure between flats, a floor or a separating wall, the notice obligations apply as they would between houses, and the neighbours above and below become part of the programme.
What we produce
Typical deliverables
- Briefing and strategic definition
- Concept and developed design
- Planning and consent submissions
- Coordinated technical and tender information
- Consultant and design-team coordination
- Construction-stage support and, where appointed, contract administration
London-specific
What to keep in mind
- Multiple consents and approvals on prime properties
- Several consultants whose information must be coordinated
- High specification and quality expectations
- Party wall, leasehold and neighbour management
How the process works
From first call to completion
Strategic definition & brief
We establish objectives, scope and a clear brief.
Concept design
We develop and test the design.
Planning
We secure the necessary consents.
Technical design
We produce coordinated construction information.
Tender
We obtain and compare contractor prices.
Construction & handover
We support the build through to handover.
Considering this for your property?
Tell us the address and a short description of the work. We will advise which drawings, approvals and consultant inputs your project is likely to need.
Avoiding pitfalls
Common risks & mistakes
- Appointing stage by stage without continuity, losing design intent
- Engaging consultants too late
- Tendering from incomplete information
- No clear leadership of the design team
Frequently asked questions
What is the RIBA Plan of Work?
Do I have to appoint a full service?
Does it include construction-stage support?
How are fees structured for a full service?
What happens if tender prices come back above the budget?
Who appoints the other consultants on a full service?
How long does a full architectural service take from brief to completion?
Explore further
Related services, areas and guides
Related services
Related areas
Discuss your project
Tell us about the property, location and the work you are considering. We will advise which architectural drawings, approvals or consultant inputs are likely to be needed.
Areas
Full Architectural Service across London
Priority local service pages and neighbourhood guides with direct evidence for this service.
North London
Central London
West & South West London
Looking for another neighbourhood? Browse the complete London areas directory.