Hampstead Architecture and Planning

Project Delivery & Support

Full Architectural Service in London

A full architectural service takes a project from first brief to completion, following the RIBA Plan of Work. We provide continuity, coordination and oversight across every stage — the most reliable way to protect design quality, manage risk and keep a prime London project on track.

Last updated

The short answer

What is a full architectural service?

A full architectural service takes a project through every RIBA Plan of Work stage — briefing, concept design, planning, technical design, tender and construction — under one accountable team. Rather than appointing stage by stage, you get continuity, coordination of consultants and single-point oversight from first brief to handover, which protects design quality and keeps a project on track.

A project, properly led

The RIBA Plan of Work organises a project into clear stages: strategic definition, preparation and briefing, concept design, spatial coordination, technical design, manufacturing and construction, and handover. A full service runs across all of them, so each stage is properly resolved before the next begins and one team holds the whole picture — the brief, the design, the approvals, the consultants and the build — rather than handing it off in fragments.

Why continuity matters in prime London

On constrained, high-value London projects, the cost of gaps between stages is high: a design that ignores planning reality, technical drawings that lose the design intent, or a build that drifts from what was approved and priced. A full service closes those gaps. We brief, design, secure approvals, produce coordinated technical information, run the tender, and support construction — including contract administration where we are appointed and insured for it.

Stage by stage, what you get

A full service delivers something tangible at each RIBA stage. Feasibility and briefing establish what is wanted and what the property allows; concept design develops the idea into tested options; the planning stage secures permission; technical design produces the coordinated building regulations and construction information; and the construction stage takes the project through tender, the build and handover. Knowing what each stage produces — and that it is resolved before the next begins — is what makes a full service predictable rather than a leap of faith.

One point of responsibility

The quiet value of a full service is that one accountable team holds the whole project. We coordinate the structural engineer, the energy assessor, the surveyor and any specialists, so the consultants’ information lines up and you are not left mediating between advisers who have never spoken. Instead of managing a series of disconnected appointments, you have a single relationship and a single point of responsibility for how the parts fit together — which is exactly where complex London projects tend to succeed or unravel.

Tailoring the service to your project

A full service does not have to mean an all-or-nothing commitment. Because the work follows the RIBA stages, the appointment can too: many clients engage us through planning and then decide on the construction stages once permission is secured, while others want us from first sketch to final handover. We agree the scope and the basis of our fee stage by stage, so the service fits the project and your appetite rather than forcing a single template onto every commission.

What “full service” covers stage by stage

In plain terms: we help define the brief and test feasibility; develop concept options; prepare the planning or freeholder packages needed; produce technical design and building regulations information; run or support tender; and remain involved through construction for design integrity. Not every client needs every stage at full intensity — some stop after planning — but a full appointment keeps one design story from first sketch to handover.

Consultants (structure, energy, heritage, party wall) are coordinated against that single story so you are not managing a fragmented team alone.

When a staged appointment is smarter

If you only need to know whether an extension is realistic, start with a route review or feasibility. If permission already exists, start at technical design. Full service is best when you want continuity on a complex home project — multiple consents, heritage constraints, or a high specification — and value one accountable lead. We map the right entry stage to your actual question so fees match risk.

Fixed fees are agreed per stage in writing. See our packages page for published drawing-stage fees and ask for a whole-project fee plan once the brief is clear.

Quality control from design to site

The risk on long residential projects is design drift: planning drawings say one thing, the tender another, and site decisions a third. Full service reduces that drift by keeping the same team responsible for coordination, specification clarity and responses to site conditions. It is not a guarantee of build cost or programme — those sit with the contractor and market conditions — but it is the structure that protects design intent when pressure rises on site.

We are transparent about what full service is not: continuous clerk-of-works supervision, cost guarantee, or planning outcome guarantee.

The consents that run on their own clocks

Planning permission is one approval among several, and the others keep their own timetables. A householder or minor application carries a statutory target of around eight weeks from validation, major applications around thirteen, but that period governs the planning decision alone. Building regulations are assessed under a separate regime against the Approved Documents covering structure, fire safety, ventilation, stairs and guarding, energy, overheating and electrical work, so a scheme can hold permission while its construction detail is still unresolved. Party wall notices run statutory periods of one or two months depending on which notice is served. Where a permission arrives with pre-commencement conditions, those must be cleared before work can lawfully start.

Holding those clocks in the right order is a large part of what a full service quietly does. Technical drawings are prepared so the building control submission and the approved scheme describe the same building rather than two versions of it. Party wall notices go out early enough that their periods run alongside tender instead of after it. And the conditions on a decision notice are read the week it lands, because discharging a pre-commencement condition on materials or drainage is a fresh application with its own wait, and the thing that moves is usually a start date somebody fixed in the diary months earlier.

When the building is shared with other owners

Alongside the statutory consents sits a private layer with no statutory clock at all. A flat or maisonette has none of the permitted development rights a house enjoys, so alterations that would go unremarked in a terrace need an application. The lease usually governs anything structural, anything touching services or common parts, and often any change to the position of wet rooms, and the freeholder's consent takes the form of a licence to alter negotiated through their surveyor and solicitor. Estates and mansion blocks often add their own rules on materials, windows and working hours, and estate or freeholder consent can require its own drawings; the building's insurers may need telling too.

Because none of this runs to a published timetable, it is the layer most likely to strand an otherwise well-run project. We treat it as a stage in its own right rather than an afterthought: establishing early what the lease actually permits, preparing the licence to alter drawings a freeholder's surveyor needs to assess rather than the ones a planning officer wants, and running the two consents side by side so they are not queued end to end. Where works reach a party structure between flats, a floor or a separating wall, the notice obligations apply as they would between houses, and the neighbours above and below become part of the programme.

What we produce

Typical deliverables

  • Briefing and strategic definition
  • Concept and developed design
  • Planning and consent submissions
  • Coordinated technical and tender information
  • Consultant and design-team coordination
  • Construction-stage support and, where appointed, contract administration

London-specific

What to keep in mind

  • Multiple consents and approvals on prime properties
  • Several consultants whose information must be coordinated
  • High specification and quality expectations
  • Party wall, leasehold and neighbour management

How the process works

From first call to completion

  1. Strategic definition & brief

    We establish objectives, scope and a clear brief.

  2. Concept design

    We develop and test the design.

  3. Planning

    We secure the necessary consents.

  4. Technical design

    We produce coordinated construction information.

  5. Tender

    We obtain and compare contractor prices.

  6. Construction & handover

    We support the build through to handover.

Considering this for your property?

Tell us the address and a short description of the work. We will advise which drawings, approvals and consultant inputs your project is likely to need.

Avoiding pitfalls

Common risks & mistakes

  • Appointing stage by stage without continuity, losing design intent
  • Engaging consultants too late
  • Tendering from incomplete information
  • No clear leadership of the design team

Frequently asked questions

What is the RIBA Plan of Work?

It is the industry framework dividing a project into stages, from strategic definition and briefing through design and technical work to construction and handover. A full service runs across all of them.

Do I have to appoint a full service?

No. We can provide feasibility and planning only, or a fuller service. A full service offers the most continuity and is well-suited to larger or higher-value projects.

Does it include construction-stage support?

Yes. A full service includes tender and construction-stage support, and contract administration where we are appointed and insured for that role.

How are fees structured for a full service?

Often as a percentage of construction cost or a staged fee. We set out fees clearly in a written proposal before work begins.

What happens if tender prices come back above the budget?

It is a normal outcome rather than a failure, and the tender stage exists partly to find it out before anyone commits. We review the returns line by line, because a high total often sits in two or three items, a structural solution, a specification, or an assumption a contractor has priced defensively, rather than being spread evenly across the job. From there the options are to adjust specification, to change or stage part of the scope, or to query and re-price particular elements. What we cannot do is guarantee a figure: prices come from the market and the contractor, not from us.

Who appoints the other consultants on a full service?

Usually you do, directly. We advise on who is needed and when, suggest people we have worked with, brief them and coordinate their information into the design, but the structural engineer, the energy assessor, the party wall surveyor and any heritage or acoustic specialist are normally appointed by you under their own terms. That keeps their duty of care and their insurance running to you rather than through us, which matters if something is later disputed. The coordination is ours; the appointments and their fees sit with you, and we will say plainly which ones a project genuinely needs.

How long does a full architectural service take from brief to completion?

A full service spans stages with very different masters, which is why no single figure covers it. The parts we run — briefing, concept design, spatial coordination, technical design and tender — move to a programme agreed stage by stage, and each goes only as fast as the decisions taken within it. The parts nobody here controls set the outer limit: the local authority's determination period for whichever consent applies, any freeholder or estate approval, and, once on site, the builder's own programme. Added together, a full service is measured stage by stage rather than as a single span, and we will not compress it into one figure at the enquiry. Because the work follows the RIBA stages, we agree the scope, the timetable and the basis of our fee stage by stage, and set them out in writing before each one begins.

Discuss your project

Tell us about the property, location and the work you are considering. We will advise which architectural drawings, approvals or consultant inputs are likely to be needed.

Areas

Full Architectural Service across London

Priority local service pages and neighbourhood guides with direct evidence for this service.

Looking for another neighbourhood? Browse the complete London areas directory.

Call 020 8054 8756Send Details