Hampstead Architecture and Planning

Technical & Building Regulations

Building Regulations Drawings for London Residential Projects

Planning drawings are rarely enough to build from. We prepare building regulations drawing packages with the technical information building control and contractors need — coordinating structure, fire, drainage, energy and ventilation input from the relevant specialists.

Last updated

Practice leadership

Eyal Moran, Director and Lead Architect, is an ARB-registered architect, leading design judgement, planning strategy and technical coordination across client projects.

Verify on the Architects Register
  • Clear fixed fees from £395
  • Free, no-obligation consultation
  • Licence to Alter drawings
  • Extensions & loft conversions
  • Planning applications
  • ARB-Registered Architects

The short answer

Do I need building regulations drawings?

Almost certainly, if you are building. Planning permission decides whether a design is acceptable in principle; building regulations govern how it is safely and soundly constructed. Most extensions, loft conversions, structural alterations, new or altered drainage and basement works are notifiable, and need a building regulations drawing package — technical drawings and specifications that satisfy building control and let a contractor price and build accurately.

Fixed fees

Our drawing & planning packages

Fixed fees quoted before you commit — set against the typical market rates for the same work, so you can compare like for like.

Our fixed-fee packages

Design fees, inc. VAT — separate from the council fees above

Hampstead Architecture and Planning fixed-fee packages
PackageFixed fee
Planning Route ReviewA paid route check before drawings or applications.£395 inc. VAT
Standard Planning Drawings PackageFor straightforward householder schemes.from £1,450–£1,950 inc. VAT
Full Householder Planning PackageDrawings plus application preparation and submission.from £2,250–£3,250 inc. VAT
Licence to Alter / Flat Refurbishment Drawing PackLeasehold flat alterations and freeholder consent drawings.from £1,500–£2,750 inc. VAT
Building Regulations / Technical Drawing PackageTechnical drawings once the planning route is clear.from £2,750–£4,950 inc. VAT
Listed / Conservation Planning PackHeritage-led drawings and consent strategy.Quoted after review

Fixed fees quoted before you commit, credited from the £395 route review if you proceed. Larger, listed or complex projects are quoted after a paid review rather than sold at a fixed price. See all packages or find your package.

Separate from planning, essential to build

Building regulations exist to ensure buildings are safe, healthy and reasonably energy-efficient, and they are separate from planning permission. Planning decides whether a design is acceptable in principle; building regulations govern how it is constructed. A typical residential project therefore needs two distinct sets of drawings — planning drawings to obtain permission, and building regulations drawings to satisfy building control and to build from.

What drawings a building regulations package includes

A building regulations package for a house or flat typically includes: existing and proposed general arrangement plans, sections and elevations at construction scale; construction details and junctions for foundations, walls, roof and thresholds; the structural engineer’s drawings and calculations for beams, foundations and load paths; and specification notes covering insulation and U-values, fire-rated construction, acoustic floor build-ups, drainage, ventilation and — for basements — waterproofing. Together these demonstrate to building control that the design satisfies each relevant Approved Document, and give a contractor enough information to price and build accurately.

Coordinated, buildable information

Our building regulations packages translate an approved design into buildable, compliant technical information covering structure, fire safety, insulation and energy, ventilation, drainage, stairs and guarding, and — for basements — waterproofing. We coordinate the structural engineer and other specialists so beams, foundations and load paths are properly designed and reflected in the drawings, and we add the construction details and specification notes a contractor needs to price and build accurately. Good technical drawings reduce variations and disputes on site.

What the Approved Documents require

The building regulations are explained through a series of Approved Documents, each covering a different aspect of construction: Part A structure, Part B fire safety, Part C moisture and ground, Part F ventilation, Part K stairs and guarding, Part L energy, Part M accessibility, Part O overheating, Part P electrical safety, and more. A residential project usually engages most of them at once. A building regulations package is, in effect, the demonstration that the design satisfies each relevant part, which is why it is a coordinated technical exercise rather than a redrawing of the planning scheme.

Demonstrating performance on paper

Much of a building regulations package is about proving performance, not just showing layout. The drawings and notes set out the U-values of walls, roof and floor and the glazing specification for energy; the floor build-ups that achieve the required acoustic separation; the fire-rated construction and protected escape; the stair geometry and guarding dimensions; and the ventilation provision room by room. Resolving these on paper, to the figures the regulations require, is what allows building control to approve the design and a contractor to build it without improvising.

Where regulations and planning differ in practice

It is common to have planning permission and still have real work to do, because building control can require changes that planning never considered — a thicker wall to meet insulation standards, a different stair to meet headroom, a rooflight specification for ventilation. The two systems ask different questions, and a scheme that looks resolved in planning can need careful technical development to actually comply. We design the building regulations stage to deliver what was approved in planning while meeting the regulations, rather than discovering a conflict on site.

What building work actually needs building regulations approval

Building regulations approval is required for far more than a new extension. Structural alterations — removing or altering a load-bearing wall, forming a large opening, inserting a beam or underpinning — are notifiable, as are loft conversions, basements, new or altered drainage, and forming a new bathroom or kitchen that adds to the drainage. Re-roofing or re-rendering can also trigger a requirement to upgrade that thermal element under Part L. Some work, by contrast, is self-certified: a registered installer can sign it off under a competent-person scheme without a separate application — replacement windows through FENSA, most domestic electrical work through a Part P scheme, and gas appliances through Gas Safe. Genuinely minor or like-for-like repairs are often exempt, and a small proportion of porches and conservatories can be too. The practical test is whether the work affects the structure, drainage, fire safety or energy performance of the building. Where it does — which covers almost every meaningful home project — a coordinated building regulations drawing package is what demonstrates compliance to building control.

When the building regulations stage fits in your project

Building regulations drawings usually follow planning, but they do not have to wait for it. Because the two systems ask different questions, the technical package can be developed in parallel with — or immediately after — the planning application, which is often the single biggest way to shorten the programme between approval and starting on site. The trade-off is that if planning negotiations change the scheme, some technical work is reworked, so we judge the overlap against how settled the design is. The stage runs the structural engineer and any energy, drainage or fire input alongside the drawings, so their information is designed in rather than bolted on. The finished package then does double duty: it is what building control approves and what a contractor prices from, which is why it flows naturally into a tender package. Deciding early whether to submit full plans for approval before work starts, or to proceed on a building notice, also shapes the timeline — full plans front-loads the certainty that keeps the build moving once it begins.

What we produce

Typical deliverables

  • Building regulations drawing package
  • Construction details and junctions
  • Structural engineer coordination
  • Specification notes for key elements
  • Building control submission support
  • Information suitable for contractor pricing

London-specific

What to keep in mind

  • Older properties need careful structural and waterproofing detailing
  • Flats raise fire-separation and acoustic requirements
  • Basements require specific waterproofing and structural design
  • Energy and ventilation requirements affect detailing

How the process works

From first call to completion

  1. Scope

    We confirm the technical scope and which consultants are needed.

  2. Technical drawings

    We develop the construction-stage package.

  3. Coordination

    We integrate structural and other consultant information.

  4. Building control

    We support full plans or building notice submission.

Considering this for your property?

Tell us the address and a short description of the work. We will advise which drawings, approvals and consultant inputs your project is likely to need.

Avoiding pitfalls

Common risks & mistakes

  • Trying to build from planning drawings alone
  • Leaving structural coordination too late
  • Overlooking fire and acoustic requirements in flats
  • Inadequate waterproofing detailing on basements

Frequently asked questions

Are planning drawings enough to build from?

Usually not. Planning drawings show the design for assessment. Building regulations drawings add the technical detail — structure, fire safety, insulation, ventilation, drainage, stairs and waterproofing — needed for building control and construction.

Do building regulations drawings include structural calculations?

Structural calculations are produced by a structural engineer. We coordinate the engineer and incorporate the structural design into the drawing package.

What is the difference between full plans and a building notice?

A full plans application submits detailed drawings for approval before work starts; a building notice allows work to proceed with inspection but less up-front detail. We advise which suits your project.

Can my builder price from these drawings?

Yes. A coordinated building regulations and tender package gives contractors a consistent basis to price from and clear information to build from.

When should building regulations drawings start?

After the planning envelope or confirmed permitted-development route is frozen enough that walls, openings and roof form will not move. Starting technical design while layout is still changing wastes engineer and redraw fees.

Do freeholder packs use the same drawings as building control?

Often freeholder surveyors want building-control-level detail for Licence to Alter. We keep one technical story so freeholder method notes and building regulations sheets do not diverge. Planning permission remains a separate track where required.

Can you coordinate drainage and build-over agreements?

Yes where shared drains or side passages affect foundations. We flag build-over risks early and coordinate the drawings with the water company process where it applies.

How much do building regulations drawings cost in London?

Fees depend on scope — the size of the project, how much new structure is involved, whether it is a house or a flat, and how many consultants (structural, energy, drainage) need coordinating. We charge a fixed fee agreed before you commit, rather than an open-ended percentage, so you know the number in advance. Our fixed-fee packages start at a £395 route review, credited in full if you proceed, and are set out on the packages page; the full building regulations package is quoted once we have understood your approved scheme.

How long do building regulations drawings take, and how long does building control take to decide?

Two clocks run here, and only one of them is ours. The drawing package itself has no published duration: it turns on how settled the approved scheme is, how much new structure the engineer has to design, and whether energy, drainage or fire input needs coordinating, so we fix the technical programme when the scope is confirmed. The statutory clock is fixed. On a full plans application the authority must decide within five weeks, or up to two months by written agreement. On a building notice you give notice and can start two days later — but a building notice cannot be used in a block of flats, which rules that route out for flat projects. The route therefore shapes the programme, not only the paperwork, and we confirm which one suits before the package is issued.

Discuss your project

Tell us about the property, location and the work you are considering. We will advise which architectural drawings, approvals or consultant inputs are likely to be needed.

Areas

Building Regulations Drawings across London

Follow the local area pages for property types, planning authority context and conservation considerations in each neighbourhood we serve.

Browse all 51 additional London areas

Published local service pages appear above. Where a service-specific page is not yet published, these links lead to the public neighbourhood hub rather than an unpublished or generic local-service page.

Call 020 8054 8756Send Details