Hampstead Architecture and Planning

Package

Listed / Conservation Planning Pack

Heritage-led drawings and consent strategy.

Quoted after review

Start with a £395 Planning Route Review.

Prices shown are package prices or from-prices for the stated scope, not deposits, unless the package specifically says it is a credited route review.

Drawings and consent strategy for listed buildings and sensitive conservation-area work. We never price this blind — we start with a short paid review, then quote accurately.

Who this is for

Owners of listed buildings, or properties in sensitive conservation settings, where heritage assessment drives the design and consent.

What’s included

  • Heritage and conservation assessment
  • Listed building consent strategy where applicable
  • Drawings prepared to heritage standards
  • An accurate fixed quote following the route review

What’s not included

  • Council / Planning Portal application fees (paid directly to the local authority)
  • Measured building survey (arranged separately unless specifically included)
  • Structural engineering calculations and details (coordinated separately)
  • Building control / building regulations submission (unless specifically included)
  • Party wall notices, awards or surveyor fees
  • Specialist heritage consultant fees where a separate appointment is required
  • Unlimited revisions — only the stated revision rounds are included

Expected next step

After the £395 Planning Route Review we provide a fixed quote for the heritage-led drawings and consent work.

Important caveats

  • Unauthorised works to a listed building are a criminal offence, so the position is always confirmed before any work.
  • Scope and fee depend on the heritage significance and the works proposed — this is quoted after review, not sold blind.

Ready to start?

Use the package finder to match your property and works, and we will confirm the scope and a fixed fee before any work begins.

Call 020 8054 8756Send Details