Hampstead Architecture and Planning

Planning & Consents

Planning Application Strategy & Submission in London

We advise on the right consent route, assemble the evidence and manage London residential planning applications from submission and validation through case-officer queries and decision. This service covers householder and full applications, listed building consent, condition discharge and amendments; the drawing package itself is explained separately on our planning drawings page.

Last updated

The short answer

How does a planning application work?

A planning application is a case to the local authority that a proposal is acceptable in policy, design and amenity terms, not just a set of drawings. You submit existing and proposed drawings, a location plan and any required statements, pay the fee, and the council decides most householder applications within about eight weeks. We prepare and manage the whole submission.

Typical fixed fee

£1,450–£3,250

inc. VAT, for the fixed-fee drawing packages that cover this service.

Find my package

A planning application is a case, not just a drawing package

A planning application is a case made to the local authority that a proposal is acceptable in policy, design and amenity terms. Our role here is to set the application strategy, choose the correct route, coordinate the planning drawing package and supporting evidence, complete the submission and manage it through validation and assessment. Keeping those parts aligned gives the case officer a consistent proposal rather than a collection of disconnected documents.

Householder, full, certificate or prior approval — choosing the route

The application route shapes the cost, the timescale and the risk. A householder application covers most single-dwelling extensions and alterations; a full application is needed for flats, new units and larger schemes; a lawful development certificate confirms that works are lawful rather than seeking permission; prior approval covers certain larger extensions and changes of use; and listed building consent runs alongside planning for listed properties. Each London borough then applies its own local plan, conservation-area appraisals and design guidance on top. We advise which route genuinely fits your property and proposal before the submission package is commissioned.

What the case officer actually weighs

Approval turns on a defined set of considerations, and a strong application speaks to each. Officers assess compliance with the development plan, the design — scale, massing, materials and how the proposal reads in its context — and the impact on neighbours, judged through daylight and sunlight (using the BRE guidance), overlooking and loss of privacy, outlook and noise. Heritage impact, trees, highways and parking, drainage and flood risk all feature where relevant, as do any objections from neighbours during the consultation period. We design and present a proposal that answers these tests rather than leaving the officer to infer the case.

Validation: why applications stall before assessment

A surprising number of applications lose weeks not on their merits but on validation. Every borough publishes a local validation list, and a submission is not even registered until it is complete: the correct fee, a location plan with the site outlined in red, the right ownership certificate, a Community Infrastructure Levy form, and any documents the list requires for that type of work. Biodiversity Net Gain now applies to many applications (householder schemes are exempt), adding a further requirement. We assemble a complete, validation-ready submission so the clock starts on the first attempt rather than after a rejection.

Timescales and how a decision is reached

Once validated, a householder or minor application carries a statutory target of around eight weeks, and a major application around thirteen, though authorities frequently ask for an agreed extension of time on busier or more sensitive cases. Most householder decisions are made by officers under delegated powers; larger or contested schemes can go to a planning committee, which is less predictable. We manage the submission and respond constructively to case-officer queries throughout, and after a grant we can discharge any pre-commencement conditions so the permission can actually be acted on. We do not guarantee approval; the decision rests with the local planning authority.

What homeowners underestimate about validation

Many applications lose weeks before an officer looks at design. Validation fails when the fee is wrong, the red-line plan is incomplete, ownership certificates do not match the title, or a borough’s local list asks for a statement that was never prepared. A people-first planning service treats validation as part of design, not as admin after the pretty drawings are finished. We assemble a complete package so the statutory clock starts on the first submission attempt.

After a grant, the job is not over. Conditions, building regulations drawings and freeholder consent are the usual next stages. Our guide to what happens after planning permission walks that sequence without pretending the decision notice is a start-on-site certificate.

Householder vs full application — which path your project takes

Most single-house extensions and alterations use a householder planning application: a defined form, a defined fee band, and a statutory target of around eight weeks once valid. A full application is needed where the works create a new dwelling, alter a flat or maisonette, change use, or sit outside the householder categories. Getting this wrong is not a paperwork quibble — the wrong form type is invalid, the fee is wrong, and the officer never starts the design assessment. We confirm the correct application type against the property tenure and the proposed works before drawings are finalised for submission.

Listed buildings add a parallel track. Listed building consent is separate from planning permission: you may need both, and works that affect special interest without consent are a criminal offence. Flats and converted houses often need a freeholder Licence to Alter as well. One approved public-law application does not replace private lease or estate consent.

What a strong London planning package actually contains

A competitive application is a coordinated set, not a single pretty elevation. At minimum you need accurate existing and proposed planning drawings (plans, elevations and sections that tell one story), a red-line site location plan, a block plan, the correct ownership certificate, the statutory fee, and any documents on the borough’s local validation list. Sensitive schemes commonly add a design and access statement, a heritage statement, tree information, flood or drainage notes, or daylight analysis. Biodiversity Net Gain is exempt for genuine householder schemes but applies to many full applications — another reason the route choice matters early.

We prepare the package so case officers can validate once and assess on policy, design and neighbour amenity rather than bounce the submission for missing sheets. That is the practical difference between “we submitted drawings” and “we submitted a planning application that can be decided.”

After decision: conditions, amendments and building next

A grant of permission is rarely a green light to dig. Decision notices carry conditions: some must be discharged before work starts, some before occupation, and some control materials or construction management for the life of the build. Starting without discharging pre-commencement conditions can put the permission at risk. Where the design needs a small tweak after grant, a non-material amendment or a section 73 variation may be appropriate; larger redesigns may need a fresh application. We plan the post-decision sequence when we design the first package, so owners are not surprised by a second round of drawings and fees.

Parallel to conditions sit building control and, for many terrace projects, party wall notices. Technical building regulations drawings turn the approved design into buildable information. Pricing a contractor from planning drawings alone is one of the most common ways London projects lose money after a successful decision.

Sounding out the council before you submit

Most London boroughs run a paid pre-application service: you send draft drawings and a short description of the proposal, and an officer responds in writing, sometimes after a meeting, with a view on the principle and the issues a formal application would face. The advice is not binding, and a different case officer may later take a different view, but it is the only way to hear the authority's position before committing to a full submission. We treat it as a decision to weigh rather than a default step.

For a straightforward rear extension on an unremarkable street it often adds cost and weeks for little benefit. For a basement, a roof addition in a conservation area, a scheme close to a refused precedent, or anything affecting a listed building, it can surface an objection in principle while the design can still move to meet it. Where the position is genuinely uncertain, a feasibility study or a formal pre-application enquiry costs far less than discovering the same objection through a refusal.

Reading a refusal and choosing the next move

A refusal notice lists the council's reasons for refusal, and everything sensible that follows starts with reading them properly. Some reasons are curable: a scheme judged too bulky can be set back or lowered, a missing daylight assessment can be produced, a concern about materials can be answered with better detail. In those cases a revised application that addresses each reason directly is usually the quicker route back. Other reasons are objections in principle, where the authority considers development of that kind unacceptable in that location; redesigning around the edges rarely shifts them, and the realistic choices are a materially different scheme or an appeal.

An appeal is decided by an independent inspector on the planning merits of the case, must be lodged within a set period of the decision, and typically takes months rather than weeks, so it is a considered step rather than a reflex. We advise honestly on which refusal reasons look winnable before any fee is spent, and prepare either the resubmission or the appeal case accordingly. Where a refusal looks likely during determination, withdrawing the application and reworking the scheme can be better than collecting a refusal on the property's planning record.

What we produce

Typical deliverables

  • Application-route and consent strategy
  • Application forms, certificates and fee coordination
  • Planning drawing brief and package coordination
  • Design and access statements where required
  • Coordination of heritage and specialist statements
  • Submission, validation and case-officer support

London-specific

What to keep in mind

  • Each borough interprets policy differently
  • Conservation areas and listed buildings raise the design bar
  • Article 4 directions can remove permitted development rights
  • Pre-application advice can de-risk sensitive proposals
  • Amenity impacts on neighbours are assessed closely

How the process works

From first call to completion

  1. Planning review

    We check the property’s history, designations and constraints.

  2. Strategy

    We recommend the right application type and approach.

  3. Evidence package

    We coordinate the drawings, statements and specialist input required for the chosen route.

  4. Submission

    We complete the forms, certificates and fee requirements and submit the application.

  5. Application management

    We respond to validation and case-officer queries through to the decision.

Considering this for your property?

Tell us the address and a short description of the work. We will advise which drawings, approvals and consultant inputs your project is likely to need.

Avoiding pitfalls

Common risks & mistakes

  • Submitting before testing the planning position
  • Choosing the wrong application type
  • Weak or missing supporting statements
  • Ignoring conservation or listing constraints

Frequently asked questions

What type of planning application do I need?

It depends on the property and works. Householder applications cover most single-house extensions; full applications cover flats and larger proposals; certificates confirm lawful works; and listed building consent is needed for many alterations to listed buildings. We advise the right route.

Can you guarantee approval?

No. The decision rests with the local planning authority. We prepare a well-presented, policy-aware application and advise honestly on prospects, but approval cannot be guaranteed.

How long does a decision take?

A householder application has a statutory target of around eight weeks, though it can take longer for sensitive or contested proposals or where an extension of time is agreed.

Do different boroughs assess differently?

Yes. Each borough applies its own local plan and guidance, and case officers interpret policy. We prepare submissions with the relevant authority in mind.

Can you manage the whole submission?

Yes. We prepare and coordinate the drawings and documents and manage the submission and case-officer queries.

Does Biodiversity Net Gain apply to my project?

Householder applications — most single-house extensions — are exempt. Biodiversity Net Gain applies to many full and major applications, where a small percentage uplift in biodiversity must be demonstrated. We confirm whether it applies to your scheme and coordinate the input if so.

Why might my application be made invalid?

Usually because something on the borough’s validation list is missing — the fee, a red-line location plan, the correct ownership certificate, a CIL form or a required statement. An invalid application is not assessed until corrected, which loses time. We submit a complete, validation-ready package to avoid this.

Is planning permission the same as freeholder Licence to Alter?

No. Planning is public law via the local authority. A Licence to Alter is private freeholder consent under the lease. Many flat and converted-house projects need both tracks — see our planning vs Licence to Alter guide.

How much does a planning application cost?

Two costs apply. The council charges a statutory application fee, set nationally and varying by application type, and we charge separately for preparing the drawings and managing the submission. We quote our fee up front before you commit, and our fixed fees begin with a £395 route review that is credited against the work if you proceed. See our /packages/ page for what each stage includes.

Will neighbour objections stop my application?

Not by themselves. The council must consider objections that raise material planning issues, such as loss of daylight, overlooking, bulk or noise, but concerns like loss of a private view or an effect on property value carry little or no weight in the decision. Officers weigh the substance of the points made, not the number of signatures, although significant local objection can mean the decision is taken by planning committee rather than under delegated powers. A well-prepared application anticipates the likely objections and answers them in the drawings and statements before they are made.

Can I change the design after the application is submitted?

Within limits. Minor revisions can often be negotiated with the case officer during determination, usually alongside an agreed extension of time, and this is a normal way to rescue a scheme heading towards refusal. Larger changes are different: if the revised proposal is substantially different from what neighbours were consulted on, the council will generally expect a fresh application rather than assess it under the same reference. We leave room for negotiation in the design from the start, so reaching a workable compromise does not mean beginning again.

Discuss your project

Tell us about the property, location and the work you are considering. We will advise which architectural drawings, approvals or consultant inputs are likely to be needed.

Call 020 8054 8756Send Details