Hampstead Architecture and Planning

Technical & Building Regulations

Building Control Applications in London

Building control checks that work complies with the Building Regulations. We support building control applications for residential projects — full plans or building notice — submitting to local authority building control or a registered building control approver and coordinating the inspection process.

Last updated

Practice leadership

Eyal Moran, Director and Lead Architect, is an ARB-registered architect, leading design judgement, planning strategy and technical coordination across client projects.

Verify on the Architects Register
  • Clear fixed fees from £395
  • Free, no-obligation consultation
  • Licence to Alter drawings
  • Extensions & loft conversions
  • Planning applications
  • ARB-Registered Architects

The short answer

What is a building control application?

It is the formal submission to a building control body — local authority or registered building control approver — showing how proposed works will meet the Building Regulations. Full plans applications seek approval of detailed drawings before work proceeds; building notices are a lighter route with more risk on site. Most meaningful residential projects need this track as well as any planning permission.

Two routes, different certainty

Building control approval can be obtained through a full plans application or a building notice. A full plans route, supported by a complete drawing package, is checked before work starts and gives more certainty and a better basis for contractor pricing. A building notice allows work to proceed with inspection but less up-front scrutiny, which suits simpler projects. We advise which route suits your project and prepare the submission accordingly.

Local authority or approved inspector

Residential building control can be carried out by local authority building control or by a registered building control approver (formerly an approved inspector). We coordinate the submission and the inspection regime with whichever body is appointed, and ensure the drawings and consultant information support a smooth approval. For higher-risk buildings, additional regimes apply and specialist support would be arranged.

The inspection regime, stage by stage

Building control is not a one-off check; it is a series of inspections through the build. The inspector is typically notified to attend at key stages — excavation and foundations, the damp-proof course, drainage before it is covered, structural elements, insulation and, finally, completion — and the work must not be covered up before the relevant inspection. Missing a stage can mean opening up finished work to prove compliance. We make sure the drawings anticipate these stages and that the contractor understands the notification points, so inspections confirm progress rather than interrupt it.

The completion certificate and why it matters

The end point of the process is a completion certificate, the building control body’s confirmation that the work complies with the regulations. It is easy to overlook in the rush to finish, but it is the document a buyer’s solicitor or a lender will ask for, and unfinished or uncertified work routinely complicates a sale or remortgage years later. We help keep the application live to completion so the certificate is actually issued, rather than the project being abandoned at practical completion with the paperwork left open.

Higher-risk buildings and the wider regime

For most houses and individual flats, the routes above apply. For higher-risk buildings — broadly those over eighteen metres or seven storeys — a separate, more rigorous regime under the Building Safety Regulator applies, with formal gateways and dutyholder responsibilities. This rarely affects a typical prime-residential project, but where a scheme approaches that threshold we are clear about it and arrange the specialist support the regime requires, rather than treating it as ordinary building control.

Full plans vs building notice

Full plans front-loads certainty: drawings are checked before you build, reducing mid-build redesign. Building notice is quicker to start but leaves compliance to inspection as work proceeds. For structural openings, lofts and complex refurbishments we usually recommend full plans. We prepare the drawing package so a full plans submission is complete rather than iterative.

Building control fees are separate from our design fees and are paid to the building control body.

What the submission needs to contain

Applications rely on coordinated technical drawings and supporting information: structure, fire, insulation, ventilation, drainage and any specialist notes. Incomplete packs generate conditions and delays. We align engineer calculations and energy information with the architectural set so the story is consistent.

Planning permission does not equal building control approval. Both may be required; neither replaces the other.

From approval to inspection

Even with full plans approval, site inspections and possible amendments occur. Construction-stage architectural support helps when unexpected conditions appear. We keep clients clear on what building control signs off versus what the contractor must still deliver under the building contract.

Regularisation of unauthorised completed work is a different, harder path — better to apply before you build.

What we produce

Typical deliverables

  • Advice on the appropriate building control route
  • Full plans or building notice submission
  • Coordination with local authority or registered approver
  • Support through the inspection process

London-specific

What to keep in mind

  • Choice between local authority and registered approver
  • Full plans gives more certainty for pricing
  • Higher-risk buildings have additional regimes
  • Flats raise fire and acoustic compliance issues

How the process works

From first call to completion

  1. Route advice

    We recommend full plans or building notice.

  2. Submission

    We prepare and submit the application.

  3. Inspection

    We support the inspection regime through construction.

Considering this for your property?

Tell us the address and a short description of the work. We will advise which drawings, approvals and consultant inputs your project is likely to need.

Avoiding pitfalls

Common risks & mistakes

  • Choosing a building notice where full plans would de-risk pricing
  • Submitting incomplete technical information
  • Overlooking inspection stages during the build

Frequently asked questions

What is the difference between full plans and a building notice?

Full plans submits detailed drawings for checking before work starts, giving more certainty; a building notice allows work to proceed with inspection but less up-front detail. We advise which suits your project.

Can I use a private building control body?

Residential building control can be by local authority or a registered building control approver. We coordinate the submission and inspections with whichever is appointed.

Does my project involve a higher-risk building regime?

Most individual homes do not, but certain buildings fall under additional regimes. Where they do, we would arrange the appropriate specialist support.

Do you manage the inspections?

We support the building control process and coordinate the inspection regime through construction, alongside the contractor.

How much does a building control application cost?

We work to fixed fees agreed in writing before each stage, starting with a £395 route review credited if you proceed. See our /packages/ page for how stages are structured.

How long does building control approval take?

Full plans checking periods depend on the building control body and the completeness of the submission; straightforward domestic full plans are often decided in a number of weeks, while complex or incomplete packs take longer. Building notice has no equivalent upfront approval period but increases site risk. We submit complete information to avoid restart delays.

Discuss your project

Tell us about the property, location and the work you are considering. We will advise which architectural drawings, approvals or consultant inputs are likely to be needed.

Areas

Building Control Applications across London

Follow the local area pages for property types, planning authority context and conservation considerations in each neighbourhood we serve.

Browse all 194 additional London areas

Published local service pages appear above. Where a service-specific page is not yet published, these links lead to the public neighbourhood hub rather than an unpublished or generic local-service page.

Call 020 8054 8756Send Details