Journal
Perspective on prime London architecture
Short, considered pieces on design, planning and process — alongside our practical how-to guides.
Process ·
Blackheath: Dual Borough Before Any Basement Box
SE3 is not one planning culture. Fix Royal Borough of Greenwich or Lewisham before lightwells and temporary works are drawn.
ReadProcess ·
Heath-Edge Basements Are Not Village Digs
A dig beside Hampstead Heath is a slope, tree and dual-borough project. Treat it like a flat village rear extension and the package fails early.
ReadProcess ·
Highgate: Three Boroughs Before Any Drawing Package
Highgate is not one planning culture. Fix Camden, Haringey or Islington on the title plan before any red-line sheet is issued.
ReadPlanning ·
Hampstead Garden Suburb Trust Consent Is Not Barnet Planning
In Hampstead Garden Suburb, Barnet planning and Hampstead Garden Suburb Trust consent are parallel tracks. Designing for only one is how redesign starts after a grant.
ReadProcess ·
Check Who Owns the Loft Before the Dormer
A beautiful dormer drawing is worthless if the lease never included the roof void. Ownership first.
ReadProcess ·
One Design for Planning and Licence to Alter
Freeholder surveyors and planning officers read different packs. They should not be reading different designs.
ReadPlanning ·
Why Invalid Planning Applications Waste Months
An invalid application is not “slow planning”. It is a package that never entered assessment. Here is what complete looks like.
ReadPlanning ·
Dulwich Estate Consent Is Not Southwark Planning
On much of the Dulwich Estate, written Scheme of Management approval sits beside Southwark planning. Treating them as the same process is how projects stall after a grant.
ReadPlanning ·
Why Highgate Needs a Borough Check First
Highgate is one place in the mind and three authorities on the map. Get the borough wrong and the planning package fails before design is even read.
ReadDrawings ·
What a Householder Planning Drawing Package Actually Contains
Owners often buy “planning drawings” without knowing which sheets actually get a householder application validated. Here is the honest list.
ReadPlanning ·
Biodiversity Net Gain: A New Small-Sites Exemption from 6 August 2026
From 6 August 2026, developments on sites of 0.2 hectares or less are exempt from mandatory Biodiversity Net Gain. For a home extension it changes nothing — you were already exempt — but for small plots and new dwellings it is a real shift.
ReadPlanning ·
Proposed Changes to Householder Permitted Development: Where Things Stand
The 2024 proposals to enlarge householder permitted development have not become law. As of mid-2026 they remain proposal-only — and in conservation areas they may not apply at all.
ReadPlanning ·
Heat Pumps and Permitted Development: What Changed in 2025
The 2025 permitted development changes made air source heat pumps far easier to install across most of England. In prime London — conservation areas, listed buildings and flats — they change surprisingly little.
ReadCosts ·
The April 2026 Planning Fee Increase: What Changed
A dated explanation of the April 2026 increase that set the householder fee at £548 — and why the current figure must be checked before an application.
ReadBuying ·
Buying With a Project in Mind: What to Check First
If your offer assumes you can extend, convert or combine, it is worth testing that assumption before you exchange — not after.
ReadPerspective ·
What Makes Prime London Residential Architecture Different
In prime London, the brief is rarely the hard part. The constraints — and the standard of coordination they demand — are what set this work apart.
ReadProcess ·
Why Early Feasibility Saves Time and Money on London Projects
The most expensive mistakes are made before design even begins — on untested assumptions about what a property can become.
ReadDesign ·
Reading a London Street: How Context Shapes Good Design
Before deciding what to add to a London home, it pays to read the street it sits in — its rhythm, materials and lines.
ReadPlanning a London project?
Tell us about the property and what you would like to achieve. We will advise on feasibility, likely approvals and the drawings your project will need.