One Design for Planning and Licence to Alter
Freeholder surveyors and planning officers read different packs. They should not be reading different designs.
By Hampstead Architecture and Planning4 min read
Two packs, one model
On multi-unit buildings, Licence to Alter and planning applications often run together. Freeholder surveyors want structural method and fire/acoustic detail; officers want amenity and character. If the openings differ between packs, one of them will force redesign.
The practical answer is one measured survey and one design freeze, then audience-specific sheets. See our compare guide: planning permission vs Licence to Alter.
Where this shows up first
Marylebone estate streets, Kensington and Chelsea stucco terraces, Notting Hill garden-square conversions and Battersea mansion blocks are frequent dual-track pins. Local money pages for Licence to Alter and planning applications are written for that sequencing — not for a kitchen collage without a lease review.
Technical drawings still come later
Building regulations drawings remain a separate product once principle is clear. Freeholder consent does not replace building control. Keep the technical story consistent so tender exclusions do not appear when the contractor prices a third version of the same flat.
Explore further
Related services, areas and guides
Related services
Related areas
Journal
More from the journal
Planning ·
Solar Panels and Permitted Development: What Changed on 27 August 2026
From 27 August 2026 the solar permitted development rules were rewritten: plug-in solar is expressly covered for the first time — including for blocks of flats — houses get reworked limits, and conservation areas carry a wider restriction. A one-year saving preserves what the rewrite removed.
ReadDrawings ·
What a Householder Planning Drawing Package Actually Contains
Owners often buy “planning drawings” without knowing what the fixed fee covers — and what sits outside it. Here is the honest sheet list.
ReadPlanning ·
Why Invalid Planning Applications Waste Months
An invalid application is not “slow planning”. It is a package that never entered assessment. Here is what complete looks like.
ReadDiscuss your project
Tell us about the property, location and the work you are considering. We will advise on the likely drawings, approvals and consultant input needed.