A Putney technical package works best as a chain of evidence from application to final inspection. For an address administered by Wandsworth, the council publishes current application, fee, commencement, inspection and completion steps. We use those milestones to decide what must be known, drawn, checked and retained at each stage, after first excluding work that belongs to the Building Safety Regulator.
Last updated
- Clear fixed fees from £395
- Free, no-obligation consultation
- Licence to Alter drawings
- Extensions, lofts & planning applications
The short answer
What should a Putney Building Regulations evidence chain achieve?
It should connect verified existing information and a numbered work scope to the correct regulator, Wandsworth application route, applicable requirements, coordinated drawings, inspections, revisions and final evidence. Each milestone has an owner and record. Planning, private rights, neighbour notices and Thames Water remain parallel controls rather than being folded into building control.
Planning at a glance
Putney
| Local planning authority | London Borough of Wandsworth |
|---|---|
| Likely approval route | Householder planning application or permitted development, depending on conservation status, listing and property type — confirmed for the exact address before drawings begin |
| Statutory determination time | 8 weeks for most householder applications (13 weeks for major applications) |
| Local planning note | Putney is covered by several of Wandsworth’s 46 conservation areas rather than a single “Putney CA”; hill and riverside streets differ in levels and outlook. Wandsworth’s Housing SPD and basement extension guidance are the householder design references borough-wide. |
| Typical drawing package | £2,750–£4,950 inc. VAT, fixed fee. Find my package → |
Stage zero is an address and record audit. The site boundary is checked against the responsible authority before Wandsworth forms are used. The file gathers measured plans, existing approvals, building use, dwelling arrangement, storeys, title or lease information and available construction records. Conflicts between records and the observed building are listed for resolution instead of silently choosing the more convenient source.
The proposed work becomes a numbered scope register. Each item states the existing condition, intervention, affected element or system and intended outcome. This prevents a drawing note for an opening, extension or internal alteration from hiding related work elsewhere. It also provides a common reference for design responsibilities, consultant instructions, building-control queries and later site changes.
Dutyholders and information ownership are set beside that scope. GOV.UK guidance requires clients to provide building information they have or could reasonably obtain, while designers must consider how their work interacts with other designs and provide sufficient information. The register therefore assigns surveys, structural design, specialist evidence, coordination and construction confirmation to named roles rather than assuming the architectural drawings answer every question.
The regulator gate is checked before the Wandsworth milestone plan begins. Current official criteria determine whether the legal building and work are higher-risk. BSR normally approves controlled work before it starts, with only defined routes for work wholly exempt, under a competent person scheme or an emergency repair. For other work, GOV.UK permits Wandsworth Council or a private registered building control approver whose registration covers the project.
Wandsworth currently accepts council applications through the Planning Portal or by forms emailed to its building-control team. Its page publishes building notice, full plans, regularisation, commencement, completion and dutyholder-change documents. The application record notes the selected form, payment status, site address and reference. This creates an auditable starting point for the subsequent notices and inspections.
For domestic alterations and extensions, Wandsworth publishes a building-notice option giving brief proposal details before work begins. It offers full plans where formal approval of domestic plans is wanted, with drawings and structural calculations where appropriate. It requires full plans for shops, offices, factories, hotels and boarding houses so the fire brigade can be consulted. Eligibility is confirmed for the actual premises rather than inferred from “Putney project”.
The timing ledger follows Wandsworth’s current process page. The council says the application is submitted 48 hours before starting on site and it is told 24 hours before commencement. Inspection visits are then requested as work progresses. These periods are not substituted for a design programme: the contractor must also wait for any separate BSR, planning, landlord, Party Wall or Thames Water step that applies.
Before issue, every scope item is tested against the current Approved Documents. Those documents give guidance on ways to meet the Building Regulations, so the project matrix selects relevant requirements and points to evidence. It may call for a plan, section, detail, specification, calculation, test or installer certificate. No fire, drainage, insulation, ventilation or structural solution is declared universally suitable for Putney buildings.
The construction set is aligned to observable milestones. General arrangements explain the whole intervention; sections and enlarged details resolve selected interfaces; schedules state performance and references; consultant information is cross-checked; and inspection notes identify work that should remain accessible. Where hidden construction matters, the package defines opening-up or survey and the decision that follows, not an invented condition.
A change log runs beside the inspection ledger. If opening-up contradicts the drawings, or a contractor proposes a different product, geometry or sequence, the affected designers review the consequences before concealment. The building-control body is given revised information when required. A site visit records what can be seen at that time; it is not approval of unreviewed work elsewhere.
The drainage milestone starts with asset evidence. Thames Water distinguishes public sewers and public lateral drains from private drains, offers mapping or enquiry routes and says an application is likely within three metres of a public sewer or within one metre of a public lateral drain. The team records ownership, alignment and measured clearance before allowing for an agreement, diversion or drawing response.
At completion, Wandsworth says it issues a completion certificate after it has been notified, carried out a satisfactory final inspection and found the work compliant. The project evidence pack is assembled earlier: final revisions, structural or specialist records, test and commissioning results and relevant competent-person certificates as applicable. Missing evidence is chased while the work remains accessible rather than left to a future sale.
The milestone plan contains separate lanes for other permissions. Planning permission and Building Regulations approval are different. A lease may require landlord consent to alterations; Party Wall Act notice duties arise from their own statutory tests; and Thames Water’s agreement protects its network. The programme coordinates dependencies, but a Wandsworth inspection or completion certificate does not grant these other rights.
Thinking about a project in Putney?
Send the address and a short description. We will confirm the likely approval route and the drawings your project needs.
Local planning
Planning & conservation context
Confirm the exact address, Wandsworth jurisdiction, existing approvals and discrepancies between records and the measured building.
Create a numbered work register and assign survey, design, coordination and site-confirmation responsibilities to competent project roles.
Classify the legal building under current higher-risk criteria before selecting Wandsworth or a registered building control approver.
Choose the Wandsworth form and application type from actual building use, work and desired plan-approval route, then record payment and reference details.
Link each applicable requirement to evidence and align drawing information with the inspection stages at which construction can be observed.
Use records or survey to establish public-sewer or lateral-drain status and distance before a Thames Water allowance is made.
Maintain separate programme lanes for planning, lease or landlord permission, Party Wall Act procedure, building control and sewer consent.
For the wider local-authority picture — policies, timescales and application routes — see planning in Wandsworth.
Services
Architectural services in Putney
Extensions & Renovations
Planning & Consents
Technical & Building Regulations
Leasehold & Licence to Alter
Nearby
Nearby Building Regulations Drawings pages
Architecture in Putney: FAQs
What should be checked before Putney drawings start?
Can I submit to Wandsworth for work in any tall residential building?
How can a Wandsworth Building Control application be made?
When does Wandsworth describe full plans rather than a building notice?
When must Wandsworth be told that work is starting?
How are inspection points reflected in the drawings?
When should a Thames Water build-over allowance be included?
What happens when site conditions differ from the Putney drawings?
Does a Wandsworth completion certificate settle planning or private rights?
How is the cost of Putney Building Regulations drawings separated from council charges?
Build a traceable Putney submission-to-completion record
Send the complete address, project scope, existing records and target programme. We can map the regulator, Wandsworth application route, information owners and inspection evidence without assuming that planning, landlord, Party Wall or Thames Water permissions are already in place.