Package
Building Regulations / Technical Drawing Package
Technical drawings once the planning route is clear.
from £2,750–£4,950 inc. VAT
Prices shown are package prices or from-prices for the stated scope, not deposits, unless the package specifically says it is a credited route review.
Construction-stage technical drawings for building control, prepared once the planning route is settled and coordinated with structural and other specialist input.
Who this is for
Projects with the planning/consent route resolved, now needing technical drawings to build from.
What’s included
- Building regulations drawings and construction notes
- Coordination with structural engineering
- Coordination with specialist consultants where needed
What’s not included
- Council / Planning Portal application fees (paid directly to the local authority)
- Building control body / approved inspector fees
- Structural engineering calculations and details (coordinated separately)
- Party wall notices, awards or surveyor fees
- Major redesigns or alternative scheme options beyond the agreed scope
- Unlimited revisions — only the stated revision rounds are included
- Specialist reports (arboricultural, daylight/sunlight, flood risk, basement impact, etc.) unless specifically listed
Expected next step
Drawings support your building control submission and can form part of a tender package for contractors.
Important caveats
- Best started after the planning route is clear, so technical work is not wasted on a scheme that may change.
Related services
Ready to start?
Use the package finder to match your property and works, and we will confirm the scope and a fixed fee before any work begins.