A whole-house refurbishment lets you renew an Ealing period home from the fabric outwards, rather than decorating over its tired wiring, cold walls and worn-out heating. We reconfigure how the house lives, renew structure and services as one system, and retrofit the solid-walled or early-cavity fabric for warmth and comfort — coordinating everything into a single contract instead of a run of disconnected jobs.

Last updated

Practice leadership

Eyal Moran, Director and Lead Architect, is an ARB-registered architect, leading design judgement, planning strategy and technical coordination across client projects.

Verify on the Architects Register

The short answer

Who does house refurbishments in Ealing?

We are residential architects who design whole-house refurbishments for Ealing's Edwardian terraces, Victorian villas, Arts and Crafts houses and 1930s semis. We reconfigure the plan, renew structure and services, retrofit solid-walled and cavity fabric for warmth, and coordinate the Ealing planning, conservation and tenure position — delivering the work as one contract rather than piecemeal jobs.

Planning at a glance

Ealing

Planning at a glance in Ealing
Local planning authorityLondon Borough of Ealing
Likely approval routeHouseholder planning application or permitted development, depending on conservation status, listing and property type — confirmed for the exact address before drawings begin
Statutory determination time8 weeks for most householder applications (13 weeks for major applications)
Typical drawing package£395–£4,950 inc. VAT, fixed fee. Find my package →

The value in refurbishing an Ealing period house rarely sits in the rooms you can already see; it sits in the fabric behind them and in how the plan connects. These are solid, generously built suburban houses — Edwardian bay-fronted terraces and semis, double-fronted Victorian villas, Arts and Crafts homes and 1930s semis — but a century of piecemeal alteration usually leaves cold external walls, single-glazed sashes or casements, an ageing heating system and circulation that no longer matches how a family lives. We start from how you want to use the whole house, then test what the structure and party walls allow, so the refurbishment renews the building as one connected home rather than redecorating its inherited compromises.

The single most important decision on a project this size is to treat it as one thing. A genuine whole-house scheme combines internal reconfiguration with new structure, a complete services renewal and a fabric upgrade, and running those as separate trades over successive years invites clashes, abortive work and a budget that drifts. Designed and tendered as a single package, the structural, mechanical and architectural information lines up, one contractor prices a complete scope against the same drawings, and the disruption happens once. That coordination is the real distinction between a refurbishment and the string of individual jobs an Ealing house often accumulates.

Period Ealing houses reward refurbishment but seldom reveal their condition until work begins. Behind sound-looking brickwork and lath-and-plaster we regularly find perished wiring, end-of-life heating and plumbing, damp at ground level, timber decay in floors and roofs, asbestos in properties of certain eras, and earlier alterations that were never quite right. We commission the surveys and opening-up that expose these issues before the design is fixed and the contract is priced, so the budget reflects the actual fabric of the building rather than an optimistic guess about what the walls and floors are hiding — which is where whole-house refurbishments most often go wrong on cost.

The fabric is where an Ealing refurbishment earns its keep. The Edwardian and Victorian stock is largely solid-walled, so internal wall insulation, careful draught-proofing and upgraded floor and roof insulation have to be detailed to manage moisture rather than trap it against original brickwork; the 1930s semis are typically early cavity construction, where the retrofit strategy is different again. South-facing bays that overheat in summer, breathable finishes, controlled ventilation and — where sensible — making the house ready for a future heat pump all belong in one coordinated fabric plan, worked through against Approved Document L while the floors are up and the walls are open. Doing this once, as part of the whole, is far cheaper than returning to any of it later.

How a whole-house project is run matters as much as how it is designed. These schemes are too disruptive and too structurally involved to live through comfortably, so we help you weigh moving out against a phased occupation, and we plan the sequence — services strip-out, structure, first fix, fabric, finishes — so trades follow one another cleanly rather than tripping over each other. We prepare a proper tender package so contractors price the same defined scope, and on work of this scale we would normally recommend a formal building contract with contract administration, so cost, changes and quality are managed against agreed terms rather than settled informally on site.

Tenure and consent set the outer limits of what a refurbishment can do, and they differ sharply across Ealing's stock. A freehold house gives you the most control, though external fabric changes in a conservation area — and almost any external change in the Brentham Garden Suburb, under its Article 4 direction — still need consent. A mansion-block or converted period flat is another matter: flats carry no permitted-development rights, so most work needs both a planning application and the freeholder's consent, and the lease has to be checked for what it permits. We confirm the planning, conservation and tenure position for the specific address before the design commits, while being candid that no consent can be guaranteed.

Local analysis

What matters in Ealing

Retrofitting solid-walled and early-cavity Ealing fabric

Ealing's period stock is a mix of construction types, and the retrofit strategy has to follow the wall. The Edwardian terraces and Victorian villas are largely solid-walled, so warmth comes from internal wall insulation, upgraded floors and roofs and thorough draught-proofing, all detailed with breathable materials so moisture moves out rather than condensing against the original brick. The 1930s semis are usually early cavity construction, which behaves differently again. We assess the build-up before specifying, design controlled ventilation alongside any insulation, and address the overheating that south-facing bays can suffer — because a fabric upgrade that ignores moisture or summer heat trades one problem for another. Done as one plan while the house is open, it is coherent and far cheaper than piecemeal fixes.

Sequencing a whole-house refurbishment as one contract

The economy of a whole-house refurbishment comes from doing everything once, in the right order. We plan the sequence so a services strip-out is followed by structural work, then first fix, fabric upgrades and finishes, with each trade inheriting a building the previous one left ready. That ordering only holds if the structural, mechanical and architectural information is coordinated before tender, so one contractor prices a complete, defined scope against a single set of drawings. It is what separates a refurbishment from the string of separate jobs an Ealing house tends to accumulate over the years — and, on schemes of this scale, we would normally recommend a formal building contract with contract administration so cost, change and quality stay controlled.

Working within Ealing's conservation and Article 4 constraints

A refurbishment can renew an Ealing house comprehensively, but its external fabric is where conservation policy bites. In the Ealing Common Conservation Area — designated in 1982 and extended in 2004 — and in the borough's other designations, original windows, front elevations, boundary walls and detailing are protected, so replacements and re-rendering are assessed for their effect on character rather than assumed. In the Brentham Garden Suburb the Article 4 direction removes most permitted-development rights, so almost any external change needs consent. We design these refurbishments to lead with internal and reversible improvements, confirm each designation at address level, and reserve external alterations for what the council will support — always without promising an outcome before assessment.

Thinking about a project in Ealing?

Send the address and a short description. We will confirm the likely approval route and the drawings your project needs.

Local planning

Planning & conservation context

Ealing is a London borough in its own right, so the London Borough of Ealing is both the council and the local planning authority — there is no borough-boundary ambiguity to resolve before a refurbishment starts. Purely internal reconfiguration of an unlisted house often falls outside planning control altogether, but the external fabric changes a refurbishment frequently wants — new windows, re-rendering, replacement front doors, altered boundary walls or the loss of a front garden to hardstanding — do not, and the council pays particular attention to front elevations and boundary treatments. Where any external element needs consent, a householder application is determined in around eight weeks once validated.

Conservation-area designation changes what the fabric of a refurbishment can do. The Ealing Common Conservation Area was first designated in 1982 and extended in 2004 to take in roads including Grange Park and Kenilworth Road, and the borough maintains a number of other designations — Ealing Green, Ealing Town Centre, Creffield, Haven Green, Montpelier Park, Mount Park and Walpole among them — each of which must be confirmed at address level. In these areas the character of front elevations, original windows, boundary walls and detailing is protected, so fabric upgrades that would be routine elsewhere are assessed for their effect on that character.

Where a refurbishment involves structural alterations close to a shared wall or boundary — removing a chimney breast, forming openings between rooms, or underpinning a settled wall — the Party Wall etc. Act 1996 runs alongside the building-regulations process rather than replacing it. Building on the line of junction, or excavating within three or six metres of a neighbour's structure, triggers notices that are separate from any planning decision. On Ealing's terraces and semi-detached pairs these procedures are common, so we identify the notifiable neighbours early and programme the notices before work reaches site.

The Brentham Garden Suburb is a nationally important Arts and Crafts conservation area with an Article 4 direction removing most permitted-development rights, so even minor external changes there — a replacement window, a repainted render, an altered porch — usually need consent. A fabric-led refurbishment in Brentham has to work with that constraint from the start, favouring like-for-like repair and reversible internal upgrades over external alterations that would trigger a refusal.

Elsewhere, conservation areas around Ealing Green, Montpelier and Walpole protect the leafy suburban character, front gardens, boundary walls and original detailing. A refurbishment can still renew a house comprehensively within these areas, but the visible external fabric is handled carefully, and designation must be confirmed for the exact address before any external change is designed in.

For the wider local-authority picture — policies, timescales and application routes — see planning in Ealing.

Illustrative study — street elevation

Architecture in Ealing: FAQs

Does a whole-house refurbishment in Ealing need planning permission?

Purely internal reconfiguration of an unlisted Ealing house often falls outside planning control. But the external fabric changes a refurbishment usually wants — new windows, re-rendering, altered front doors or boundary walls, or hardstanding over a front garden — can need consent, especially in a conservation area or the Brentham Garden Suburb. We confirm the position for your exact address before the design is fixed.

How much does a house refurbishment in Ealing cost?

Architect fees depend on the scope, the property and the consent route — a solid-walled Victorian villa needing fabric retrofit differs greatly from a straightforward internal refresh. Our published packages start from a fixed fee, confirmed once the scope is clear, and exclude council application charges and specialist consultant fees such as structural engineering and party wall costs. We set out exactly what is included before you commit.

Should I move out or live through the refurbishment?

A true whole-house refurbishment is usually too disruptive and structurally involved to live through comfortably. We help you weigh moving out against a phased occupation, and where you stay we sequence the works and isolate zones. On an Ealing house being fully rewired, replumbed and re-serviced with floors up throughout, a decant is often the faster and more practical route.

Can you renew the wiring, heating and plumbing at the same time?

Yes — a full refurbishment is the ideal moment. With floors up and walls open we renew the electrics, heating and plumbing as one coordinated system, upgrade insulation and ventilation within what the period fabric will tolerate, and coordinate everything with building regulations. Doing it once, while the house is already open, is far cheaper and less disruptive than returning to services work later.

How do you insulate a solid-walled Edwardian house without causing damp?

Carefully, and as part of one fabric plan. Solid-walled Ealing houses need internal wall insulation, draught-proofing and floor and roof upgrades detailed to manage moisture rather than trap it against original brickwork, with breathable finishes and controlled ventilation. We assess the wall build-up before specifying, because an insulation strategy applied without ventilation can create the damp problems it was meant to solve.

What does the Brentham Garden Suburb Article 4 direction mean for my refurbishment?

The Brentham Garden Suburb is a nationally important Arts and Crafts conservation area with an Article 4 direction removing most permitted-development rights, so even minor external changes — a replacement window, repainted render or an altered porch — usually need consent. A refurbishment there is designed to favour like-for-like repair and reversible internal upgrades, with external alterations confirmed with the council before they are committed.

Do I need freeholder consent to refurbish a period flat in Ealing?

Almost always. Ealing's mansion blocks and converted period flats are typically leasehold, and flats carry no permitted-development rights, so most work needs both a planning application and the freeholder's or managing agent's consent through a licence to alter. The lease also has to be checked for what it permits. We prepare the drawings and technical evidence that support that consent alongside building control.

Will I need a party wall agreement?

Probably, if the works affect a shared wall or structure near a boundary — common on Ealing's terraces and semi-detached pairs when removing a chimney breast, forming openings or underpinning. The Party Wall etc. Act 1996 runs alongside planning and building control, and building near the line of junction or excavating close to a neighbour's structure triggers notices. We flag them early so surveyor appointments do not delay the start.

How long does a whole-house refurbishment take?

Design, approvals and construction typically run across many months. Where external work needs a householder application, Ealing determines it in around eight weeks once validated, but surveys, tendering, party wall procedures and — in conservation areas — the added care over external fabric all add time. We programme these from the outset so the sequence is realistic rather than optimistic.

Do you produce drawings my builder can price and build from?

Yes. We prepare building-regulations and tender drawings so contractors price the same defined scope consistently and build from clear information covering structure, fire, insulation, ventilation, drainage and finishes. For a whole-house project this coordinated package is what keeps cost and quality controlled, rather than leaving key decisions to be interpreted trade by trade on site.

Plan your Ealing house refurbishment

Tell us about your Ealing house or flat and how you want it to work. We will advise on the planning, conservation and tenure position, the surveys worth commissioning early, and how to coordinate reconfiguration, services renewal and fabric retrofit as one project — then confirm a fixed fee once the scope is clear.