What Brent’s Article 4 coverage means in practice
Brent covers all of its residential conservation areas with Article 4 directions, and for an extension project the effect is specific. An Article 4 direction withdraws named permitted development rights, so work that would have been automatic elsewhere becomes a householder planning application. Three consequences follow and each is worth programming for. The application adds time, so the overall timetable lengthens by the determination period. The scheme is assessed against local plan policy and the relevant character appraisal rather than measured against a fixed envelope, so the drawings have to make a case rather than merely demonstrate compliance. And the prior approval route that would have allowed a deeper single-storey rear extension is closed, so any additional depth has to be justified on planning merits instead. None of that prevents a good extension in a designated part of Willesden — the Mapesbury streets contain plenty of well-handled rear additions — but it changes how the scheme is developed and what evidence accompanies it. Brent also confirmed a separate borough-wide Article 4 direction in February 2022 removing the permitted development right to convert a dwellinghouse to a small house in multiple occupation, which is relevant where a Willesden property is being reorganised rather than simply enlarged.