A whole-house refurbishment in Greenwich pulls reconfiguration, services renewal and careful repair of period fabric into one coordinated contract. We plan the works, plan form and phasing for Georgian terraces, Maze Hill and Westcombe Park villas and converted period flats, managing the Royal Borough of Greenwich's conservation and World Heritage setting and, where a home is listed, the consent route that documents every intervention against significance.

Last updated

Practice leadership

Eyal Moran, Director and Lead Architect, is an ARB-registered architect, leading design judgement, planning strategy and technical coordination across client projects.

Verify on the Architects Register

The short answer

Who should design a whole-house refurbishment in Greenwich?

A whole-house refurbishment in Greenwich is best led by an architect who can coordinate reconfiguration, full services renewal and sensitive repair of period fabric into one contract while managing the World Heritage setting, conservation areas and, on listed homes, the consent every intervention is documented against. We plan the design, phasing and technical evidence period villas, terraces and flats need.

Planning at a glance

Greenwich

Planning at a glance in Greenwich
Local planning authorityRoyal Borough of Greenwich
Likely approval routeHouseholder planning application or permitted development, depending on conservation status, listing and property type — confirmed for the exact address before drawings begin
Statutory determination time8 weeks for most householder applications (13 weeks for major applications)
Typical drawing package£395–£4,950 inc. VAT, fixed fee. Find my package →

A whole-house refurbishment differs from a single extension or loft because every system in the building moves at once. In a Greenwich villa, Georgian terrace or converted flat that usually means stripping back toward structure, rethinking how the house is entered and circulated, renewing wiring, heating, plumbing, ventilation and drainage, and rebuilding finishes to a high standard. Pulling those trades into one coordinated contract, rather than a run of overlapping small jobs, is what keeps a large project on programme and free of the clashes that appear when services, structure and interiors are designed in isolation. It matters more here than almost anywhere because so much of the fabric is period and, on listed homes, legally protected, so the order in which repair, retrofit and renewal happen has to be resolved on paper before anyone lifts a floorboard. A whole-house project is also the one realistic moment to correct problems the house has carried for decades, doing it once in a single planned sequence rather than reopening finished rooms later.

Reconfiguration is usually the reason owners start, but in Greenwich it runs straight into the plan form the heritage designation values. The villas around Maze Hill and Westcombe Park and the Georgian terraces near the town centre and Croom's Hill were planned for a domestic pattern that no longer suits how families live, so the work is often about circulation: reworking the principal stair, connecting formal rooms into a more usable ground floor, or bringing lower-ground space into everyday use. On a listed home the original plan form and its sequence of rooms are themselves controlled, so we survey and test which walls, doorways and joinery are significant before proposing to move anything, and we document the justification where consent is engaged rather than presenting the change as a fait accompli on site.

Services are where whole-house budgets are won or lost. Period Greenwich houses and converted flats frequently retain wiring, boilers, pipework and ventilation that are decades old, and a refurbishment is the one moment to renew them behind the finishes rather than after them. We coordinate the M&E design, heating, hot water, electrical loads, data, lighting and extract against riser positions, floor build-ups and ceiling voids, so the routes are proven before plaster goes on and nothing has to be reopened later. Threading modern services through solid walls, ornate ceilings and original floors demands that the surveyed positions of cornices, joinery and structure drive the routing, rather than being discovered mid-strip when the cheapest correction is to cut through the very detail the conservation or listed status expects you to keep. We also plan the heat source, hot-water and ventilation strategy against what a period building can accommodate, so the specification is settled before it dictates awkward boxing-in or dropped ceilings that would spoil the proportions.

Much of the pleasure of these homes is in their fabric: sash windows, shutters, cornices, joinery, chimneypieces and the tall proportions of the principal rooms, and a good Greenwich refurbishment upgrades performance without eroding that character. We approach insulation, secondary glazing, draught-proofing and acoustic separation as careful, element-by-element retrofit, retaining and repairing original features where they survive rather than stripping them out for a uniform specification. In the World Heritage setting and the conservation areas, and on any listed home, that restraint is not simply good conservation practice: it is what keeps external and listed-fabric decisions defensible, which is often the difference between a scheme a case officer can support and one that stalls in consultation. We set the retrofit standard the specific building can actually carry, not a generic target, and we favour reversible, breathable measures on solid-walled period homes so that improving comfort and running costs does not trap moisture in walls that were never built to be sealed.

Sequencing is the quiet discipline of a large refurbishment. A full Greenwich house is rarely habitable mid-works, so we plan at design stage whether the project runs in one decanted phase or splits so part of the home stays usable, and we set the order of structure, services first-fix, plaster, second-fix and finishes so trades are not fighting for the same space. On a flat within a converted period house that phasing has to respect access windows, protection of common parts, hoisting and delivery routes, working-hour rules and the freeholder's conditions under a Licence to Alter. We build those constraints into the programme rather than discover them on site, because in a shared building a mid-contract dispute with a managing agent or neighbour is one of the most common causes of delay, and a well-ordered programme keeps the house watertight and secure at each handover between trades.

Because Greenwich homes so often carry conservation, World Heritage-setting or listed status, and because converted flats bring freeholder interests, we open a refurbishment by confirming the address-specific position rather than assuming it. Where an address sits near a boundary such as Blackheath, which can span more than one authority, we confirm the responsible council before advising rather than copying a neighbour's precedent. From there we develop the design, produce the planning, listed building consent and building regulations drawings the works require, and coordinate the structural engineer, party wall surveyor and, on flats, the Licence to Alter. The aim is that the interior architecture you want is supported at every stage by the technical and consent evidence a project of this scale and sensitivity depends on, with the drawings, specifications and heritage justification all pointing the same way, so the works run as one continuous programme rather than a sequence of separate battles with the council, the freeholder and the neighbours.

Local analysis

What matters in Greenwich

One contract, or a run of small jobs?

Owners often arrive having already had a kitchen quote, a bathroom quote and a decorator lined up. The case for pulling a Greenwich whole-house project into a single contract is coordination: one party responsible for the interfaces between structure, services, joinery and finishes, one programme, and one drawing set everyone prices against. It matters more here because so much of the fabric is period and often protected, so sequencing repair, retrofit and services correctly, and documenting anything listed consent controls, is far harder and more expensive to unpick once finishes are in. A coordinated contract also keeps the conservation and listed-fabric evidence consistent, so the case presented to the council matches what is actually built and no later trade quietly undoes a commitment made in the consent.

Refurbishing within a listed or conservation-area home

The hardest discipline in a Greenwich refurbishment is upgrading a period home without eroding what makes it significant. On a listed house the interior joinery, plan form and historic fabric are controlled as much as the elevation, so we survey and record what is significant before design, and shape the reconfiguration around what must be retained rather than treating retention as a constraint to negotiate away. In the World Heritage setting and the conservation areas, even an unlisted home's window changes, rooflights and visible plant are assessed against the wider character, so an internal layout should not force an unsympathetic external move late on. Getting that judgement right early, and confirming the specific conservation area and any Article 4 position for the exact address, keeps the scheme both buildable and consentable.

Renewing services behind period fabric

Threading modern services through a period Greenwich house without damaging what makes it worth keeping is the coordination that most often goes wrong. Chasing new circuits, soil routes, extract and heating through solid walls, ornate ceilings and original floors has to be planned against where cornices, joinery and structure actually sit, surveyed before design rather than assumed on site when the cheapest route runs straight through a historic feature. Getting the riser and void strategy right early is what allows a fully renewed electrical installation, ventilation and heating to disappear into the building instead of scarring it. On a listed home it keeps the intervention minimal enough to document where consent applies, and on a converted-house flat it lets the acoustic and fire separation the Licence to Alter expects be built in cleanly.

Thinking about a project in Greenwich?

Send the address and a short description. We will confirm the likely approval route and the drawings your project needs.

Local planning

Planning & conservation context

Greenwich sits within the Royal Borough of Greenwich, and central Greenwich lies within, or immediately alongside, the Maritime Greenwich World Heritage Site, which encompasses the Old Royal Naval College, the Queen's House and the Royal Observatory. Purely internal refurbishment is largely outside planning control, but a whole-house scheme rarely stays wholly internal: replacement windows, rooflights, external plant, flues or altered fenestration can each trigger a householder application, determined in around eight weeks. Because so much of the area carries heritage weight, the external scope should be confirmed for the exact address before it is fixed.

Even for an unlisted home, alterations are assessed against their contribution to the setting of the World Heritage Site and the conservation area, so window replacements, roof changes and any external works receive close scrutiny. Permitted development rights are frequently restricted here, and an Article 4 Direction may apply, which can remove rights that would elsewhere let external changes proceed without an application. We test which parts of a refurbishment need consent rather than assuming a scope is internal enough to avoid it.

Where a property is listed, works to it, inside or out, generally require listed building consent in addition to any planning permission, and that control extends to the interior. Removing joinery, cornices, chimneypieces or historic plan form during a strip-out can itself be an offence without consent, so on a listed Greenwich home the refurbishment is designed around what must be retained and documented, and the consent evidence is prepared before demolition rather than after. For flats within converted period houses, a freeholder's Licence to Alter usually runs alongside the council route.

Greenwich has a high concentration of listed buildings and several conservation areas, including Greenwich Town Centre and West Greenwich, with Greenwich Park among the conservation areas in western Greenwich forming part of a highly sensitive heritage setting. A whole-house refurbishment that touches the exterior is judged against that character, so window changes, visible plant and rooflights need early thought rather than late compromise, and the design should confirm the specific conservation area and any Article 4 position for the address.

Because the wider setting of the World Heritage Site is a material consideration even on unlisted homes, restraint at the exterior is not only good conservation practice but what keeps a scheme defensible if consent is engaged. Internal reconfiguration has more freedom, but the two should be planned together so an interior layout does not force an unsympathetic external change late in the design.

Greenwich contains a high concentration of listed buildings, so a period townhouse, villa or terrace here may be statutorily listed. Where it is, listed building consent is required for alterations, and that control reaches internal joinery, plan form and historic fabric as well as the exterior. The listing entry and its extent should be confirmed for the exact property before any strip-out, because a whole-house refurbishment is precisely the moment protected detail is most at risk of being lost.

For the wider local-authority picture — policies, timescales and application routes — see planning in Greenwich.

Illustrative study — street elevation

Nearby

Nearby House Refurbishment Architects pages

Architecture in Greenwich: FAQs

What counts as a whole-house refurbishment?

It is a coordinated project that combines internal reconfiguration, full renewal of services such as wiring, heating and plumbing, and rebuilt finishes into one contract, rather than a single extension, loft or one-room upgrade. In Greenwich it typically means taking a period villa, terrace or flat back toward structure and rebuilding it around how you actually live, while retaining the historic fabric that gives the house its character.

Do I need planning permission to refurbish a house internally in Greenwich?

Purely internal works are largely outside planning control. But a whole-house scheme often touches the outside: window replacements, rooflights, external plant or flues can require a householder application to the Royal Borough of Greenwich, usually determined in about eight weeks. Because permitted development is frequently restricted here and an Article 4 Direction may apply, we confirm which parts of your scope need consent for the exact address.

My house is listed. Does that change the refurbishment?

Significantly. Where a home is listed, listed building consent is generally required for alterations, and that control reaches internal joinery, plan form and historic fabric as well as the exterior. Removing protected detail during a strip-out without consent can be an offence, so we confirm the listing extent, design around what must be retained, and prepare the consent evidence before demolition rather than after.

How much do house refurbishments in Greenwich cost?

Fees depend on the scope, the property and the consent route. Our published packages start from a fixed fee confirmed once the scope is clear, and that fee excludes council and consultant charges. For a whole-house project we scope the reconfiguration, services and consents first, then confirm a fixed design fee against that brief, with no guessed figure beforehand. See our packages page for how the fee stages work.

Can I renew all the services during a refurbishment?

A whole-house refurbishment is the ideal moment to renew wiring, heating, hot water, ventilation, drainage and data, because the routes can be threaded behind finishes rather than chased in afterwards. We coordinate the M&E design against risers, floor build-ups and ceiling voids, and in a period Greenwich house against the surveyed positions of cornices, joinery and structure, so nothing has to be reopened once plaster and finishes are complete.

Will a refurbishment damage the original period features?

It should not. We treat sash windows, shutters, cornices, joinery and chimneypieces as fabric worth retaining and repairing, and approach insulation, secondary glazing and acoustics as careful retrofit rather than wholesale replacement. In Greenwich's conservation areas and World Heritage setting, and on any listed home, that restraint also keeps external and listed-fabric decisions defensible if consent is engaged.

Can I improve energy performance without harming the character?

Usually yes, through measured retrofit rather than blanket measures. Secondary glazing, sympathetic insulation to appropriate elements, draught-proofing of original sashes and better services can lift comfort and performance while keeping historic fabric. In a conservation area or on a listed home the approach has to respect the setting and any consent requirements, so we tailor the retrofit to what the specific building can carry.

Do converted-house flats need freeholder consent for a refurbishment?

Almost always where works are structural or significant. Freeholders and managing agents typically require a Licence to Alter supported by drawings covering structure, acoustic separation, fire and services. Many Greenwich flats sit within larger converted period houses, so we identify the freehold and leasehold position early, as it can shape the design and phasing before finishes are chosen.

Should I move out during the works?

For a full house refurbishment the usual answer is yes. A decant lets structure and services be renewed cleanly and generally shortens the overall programme. On a flat within a converted house, part-occupation is occasionally possible but rarely comfortable, and access and common-part protection add constraints, so we decide the phasing and decant strategy at design stage rather than on site.

How long does a whole-house refurbishment take?

It varies with size, condition and consent route, but expect distinct design, approvals and construction stages rather than a single timeline. A larger Greenwich villa carrying structural work, full services renewal and listed building consent takes longer to prepare and build than a lighter flat refurbishment, which is why we phase it deliberately and confirm the programme against the specific scope.

Is my house in the Royal Borough of Greenwich?

Central Greenwich is administered by the Royal Borough of Greenwich, but the wider area borders other authorities: Blackheath addresses, for example, can fall to Greenwich or Lewisham depending on the exact location. Because the authority, records and validation expectations differ, we confirm the responsible council for your precise address before settling any external scope or planning route.