Hampstead Architecture and Planning

Kensington & Chelsea

Kitchen Extension Architects in Kensington

We design kitchen extensions and kitchen relocations for Kensington houses and flats — rear kitchen-diners at the bottom of tall stucco townhouses, and reconfigured kitchens inside mansion flats where there is nothing to extend into. The job turns on three things owners rarely raise first: where the extract duct leaves the building, whether the waste can reach a stack at a workable fall, and whether the Royal Borough or your freeholder is the body whose consent actually decides the scheme.

Last updated

Practice leadership

Eyal Moran, Director and Lead Architect, is an ARB-registered architect, leading design judgement, planning strategy and technical coordination across client projects.

Verify on the Architects Register

The short answer

Do you need planning permission for a kitchen extension in Kensington?

Usually, for a house. Conservation designation and Article 4 directions remove permitted development rights across much of Kensington, so a rear kitchen extension normally needs a householder application to RBKC, determined in around eight weeks. A flat cannot extend outward at all: the kitchen is relocated inside the demise, which needs the freeholder's consent through a Licence to Alter.

Planning at a glance

Kensington

Planning at a glance in Kensington
Local planning authorityRoyal Borough of Kensington and Chelsea
Conservation areaKensington Conservation Area — appraisal adopted 3 February 2017
Likely approval routeHouseholder planning application or permitted development, depending on conservation status, listing and property type — confirmed for the exact address before drawings begin
Statutory determination time8 weeks for most householder applications (13 weeks for major applications)
Typical drawing package£395–£4,950 inc. VAT, fixed fee. Find my package →

A Kensington kitchen project begins with two facts about the property rather than about the kitchen: whether you own a whole house or a flat within one, and which floor the kitchen currently occupies. In the borough's tall stucco townhouses the kitchen very often sits at lower-ground level, tucked behind a front area and cut off from both the garden and the rooms above, so the real brief is rarely more worktop — it is to bring cooking, eating and the garden onto one level, which usually means extending at the back of the lowest floor rather than the one you walk in on. In a mansion flat or a converted-house apartment there is no outward to extend into at all: the demise is fixed, the kitchen is relocated within it, and the freeholder rather than the Royal Borough becomes the body whose consent decides the scheme. These are two different projects, with two different sets of failure, and we establish which one you have before drawing anything.

Extraction is the constraint that quietly reshapes most Kensington kitchen designs, and it is the one owners raise last. A recirculating hood asks nothing of the building; a ducted extract that genuinely clears steam and frying smells needs an uninterrupted run of ductwork at a diameter the fan can work with, terminating somewhere on the outside of the building. Where the walls are solid period masonry rather than cavity-built, there is no convenient void to hide a duct in, and a lower-ground kitchen is the hardest case of all, because the nearest external face may be a lightwell or an enclosed front area rather than open air. The routes that actually work — out through the flat roof of the new extension, at a discreet low level on a rear or flank face, or up a redundant flue where one survives and can be lined — each change the duct's length and its bend count, and therefore its performance. We fix the terminal before the ceiling and the beam are designed, not after the kitchen has been ordered.

Where the sink, the dishwasher and any utility appliances land is a drainage question dressed as a layout question. Move them away from the wall carrying the existing stack and the waste has to travel further, and every additional metre is bought with fall — a gradient that has to fit inside a floor zone already claimed by insulation, screed and underfloor-heating pipes. In a lower-ground Kensington kitchen that zone is unusually tight, because the finished level is pinned at both ends: it must meet the existing floor inside and reach a workable threshold out to the garden, and there is no simply digging down without engaging an entirely different and far more heavily controlled order of works. An island sink is the sharpest test of all this, since its waste crosses beneath the slab and must be set out before anything is poured. So we settle the build-up and the falls alongside the plan rather than after it, because a fall that will not fit is discovered on site, never on a mood board.

Opening the back of the lowest floor so the old kitchen and the new space read as one room is the structural heart of the job. Taking out a rear wall means a beam, and generally a goalpost frame whose columns and padstones carry load down onto new foundations. In Kensington's closely built terraces and mews one of those bearings almost always lands in a wall shared with a neighbour, while the foundation itself is dug close to their structure — so the Party Wall etc. Act 1996 follows from both the line of junction and the excavation, and it runs on its own timetable irrespective of what the planning decision says. The design question worth settling early is whether that beam drops down into the room or sits flush within the ceiling. A flush beam buys an uninterrupted soffit, but it competes for exactly the same depth as the extract duct, the lighting void and any recessed rooflight upstand, so the two are coordinated on the drawings rather than left to collide on site.

In a Kensington mansion flat or a converted-house apartment the kitchen cannot grow, so the project is to move it — out of a dim back room into the light, or into a plan that finally lets people cook and sit in the same space. That is a lease exercise before it is a design one. Freeholders and managing agents here generally require a Licence to Alter supported by drawings, and their surveyor will press hardest on three things: structure, acoustic separation to the flat below, and fire. Many leases restrict placing wet areas over a neighbour's habitable rooms, which can decide the sink position before the plan does. The block's soil stacks sit in fixed risers, so new waste has to reach one of them at a workable gradient within a shallow floor build-up, and any new extract route out of the building needs the freeholder's agreement and, because it is an external change, a planning view as well. We read the lease and survey the risers before proposing a new kitchen position.

Tenure has one further wrinkle here that catches owners out. Parts of Kensington remain within estate freeholds — the Phillimore Estate among them — so even a house can carry lease covenants that require the freeholder's consent alongside the Royal Borough's, and that consent is a separate process with its own timetable. Once the consents are mapped, the room still has to work as a kitchen. Building regulations set the extract and background ventilation it must provide, cap the heat loss a new extension may carry, and govern the structure, drainage and fire separation around it. Those are not hurdles bolted on at the end; they are the reason the hob position, the duct route, the rear glazing and the floor build-up are decided together at the outset. A Kensington kitchen designed that way is buildable, quiet and dry. One designed as a plan first and a services problem later is neither.

Local analysis

What matters in Kensington

The lower-ground kitchen and the level change to the garden

The defining problem of a lower-ground Kensington kitchen is that it sits at the bottom of the section, and where the garden it should open onto does not meet it cleanly at that level the two have to be reconciled. Bringing them together is the reason most of these projects exist, and it is a levels exercise before it is an aesthetic one. The threshold has to be flush enough to feel continuous, yet detailed to keep surface water out — which in practice means a drained channel and a proper upstand rather than an optimistic flush line drawn on a plan. Steps, a re-graded terrace or a small sunken area may be needed to make the connection read naturally, and each option eats into the floor zone that the insulation, the screed and the waste falls are already competing for. It is resolved at survey stage, because a threshold that cannot be drained cannot be built.

Glass, heat and the rear elevation

A wall of glass onto the garden is the ambition in nearly every kitchen brief, and it is where building regulations and comfort push back. The regulations cap the heat loss a new extension may carry, so an unusually glazed rear elevation has to be earned through a calculated trade-off in the rest of the fabric rather than simply specified. Comfort pulls the same way from the other direction: a large, glazed, south- or west-facing kitchen can overheat badly, and the answer is rarely to shrink the opening. Shading, the position and specification of rooflights, and the glass itself do more work than a smaller door set ever would. On a rear elevation facing a communal garden the glazing is also a conservation question, so the proportions and the sections are drawn with that assessment in mind.

The island, the hob and what the layout has to earn

The island is usually what decides whether a Kensington kitchen feels generous or merely large, and it is also where the servicing bites hardest. Putting the sink or the hob in it means running waste beneath the slab, or bringing an extract route out through the floor and up again — neither of which can be added once the concrete is down. So we test the island against the things that actually govern it: the fall available to the nearest stack, the duct route to the terminal, door swings, the path out to the garden, and the sightlines from the dining end. Where the cooking, the noise and the clutter can be pushed into a utility or a pantry, the main room gets to be a room rather than an appliance store. That decision belongs at layout stage, when it is still free.

Thinking about a project in Kensington?

Send the address and a short description. We will confirm the likely approval route and the drawings your project needs.

Local planning

Planning & conservation context

A kitchen extension in Kensington is assessed as an extension rather than as a kitchen, so for a house the normal route is a householder application to the Royal Borough of Kensington and Chelsea, determined in around eight weeks once validated. The permitted development allowance a single-storey rear addition might otherwise rely on is commonly unavailable here, because conservation designation and Article 4 directions remove or curtail those rights across much of the area — and they have never applied to flats or maisonettes at all. The applicable route should be confirmed for the exact address rather than inferred from what a neighbour built.

What distinguishes a kitchen from any other rear extension, in planning terms, is the servicing hardware it brings onto the elevation with it. An extract terminal, rooflights over the new roof, a boiler flue or a condenser are small items, but they are visible ones, and on a protected rear elevation — particularly one facing a communal garden square — they are exactly what a case officer will pick up. Showing them on the submitted drawings is cheaper than a second application later. Where the property sits within a conservation area, or where the building proves to be listed, the tolerance for a grille or cowl on a historic face is lower still, and the designation and listing position should be confirmed for the specific address.

Two frameworks then run alongside planning rather than inside it. Neighbouring daylight and sunlight are weighed with reference to the established BRE tests, and a right to light is a private civil matter that a planning consent does not settle. Separately, the Party Wall etc. Act 1996 governs building on the line of junction and excavating within three or six metres of a neighbour's structure — which a kitchen extension's beam bearings and new foundations routinely do in Kensington's closely built stock. Building regulations cover the rest: structure, fire, insulation, ventilation and the drainage the kitchen depends on. We do not promise approval; we establish the realistic route before a layout is committed.

Conservation-area coverage across Kensington is extensive, and a rear kitchen extension is largely hidden from the street — which means the conservation assessment lands on the parts that are not hidden. The roof form and glazing of the addition, the rooflights above it, and the extract terminal, flue or condenser fixed to a stucco or brick elevation carry more weight in the case than the kitchen inside ever will.

Where the rear elevation faces a communal garden square it is effectively a second public face, so a discreet, well-detailed servicing strategy is worth developing early rather than negotiated late. The designation should be confirmed for the exact address before any external item is assumed acceptable.

Listing is common in Kensington. Where a house or flat is listed, listed building consent is likely to be required alongside planning permission, and it extends to internal work — so cutting a duct route through historic fabric, removing a chimneybreast to gain a run of units, or altering original joinery for a new kitchen can each need consent in their own right. The building's status and the extent of the listing must be confirmed for the exact address before a layout is drawn.

For the wider local-authority picture — policies, timescales and application routes — see planning in Kensington & Chelsea.

Illustrative study — street elevation

Architecture in Kensington: FAQs

Do I need planning permission for a kitchen extension in Kensington?

Usually, for a house. Conservation designation and Article 4 directions commonly remove the permitted development rights a single-storey rear addition might otherwise use across much of Kensington, so a householder application to RBKC — determined in around eight weeks — is the normal route. A kitchen rebuilt entirely inside a flat generally falls outside planning control but squarely inside the lease. We confirm the position for your exact address.

How do you extract cooking smells from a solid-wall Kensington house?

With a ducted extract rather than a recirculating hood, and with the route designed in from the start. Period masonry has no cavity to hide ductwork in, so the run is plotted around the new beam and ceiling, and the terminal has to emerge somewhere acceptable — often through the flat roof of the extension, low on a concealed face, or up a lined redundant flue. Duct length and bends affect performance, so the terminal is fixed early.

My kitchen is at lower-ground level — can I open it to the garden?

Often yes, and it is usually the whole point of the project. The difficulty is normally the level change, where one exists: the finished floor must meet the existing one inside and reach a workable threshold outside, so the design has to resolve any steps or a re-graded terrace, keep surface water out with a drained channel and a properly detailed upstand, and still leave depth for insulation, screed and the drainage falls.

Can I extend the kitchen in a Kensington mansion flat?

Almost never outward — the demise is fixed. The gain comes from relocating the kitchen within the existing plan rather than adding floor area. That is a freeholder matter: a Licence to Alter supported by drawings covering structure, acoustic separation and fire is typically required, and any external change such as an extract terminal is a planning matter as well. We read the lease before proposing a new kitchen position.

Will the drains have to move for a kitchen extension?

Frequently. Moving a sink or dishwasher away from the wall carrying the existing stack lengthens the waste run, and every extra metre needs fall, which must fit inside a floor zone shared with insulation, screed and underfloor heating. Where an island carries the sink, the run passes beneath the slab and has to be set out before the floor is laid, so we resolve the falls with the plan.

Do I need a steel beam, and can the ceiling be flush?

Removing the rear wall to make one connected room almost always needs a beam, often a goalpost frame with columns and padstones onto new foundations. Whether it sits flush in the ceiling or drops into the room is a real decision: a flush beam gives a clean soffit but competes with the extract duct and the lighting void for the same depth. On a terrace or mews house the bearing usually engages the Party Wall etc. Act 1996.

Can I have a fully glazed rear wall on my kitchen extension?

Sometimes, but not automatically. Building regulations limit the heat loss an extension may carry, so a wall of glass generally has to be justified by a calculated trade-off elsewhere in the fabric rather than simply drawn. Orientation matters too: a large glazed kitchen taking afternoon sun can overheat, and shading, rooflight position and glass specification usually solve that better than shrinking the opening.

Should I keep gas or move to induction?

It changes the drawings, not just the cooking. An induction hob draws a substantial electrical load, so the consumer unit and circuit must be checked and the work certified. Gas keeps the existing supply but brings combustion-ventilation requirements and, if the hob moves, a relocated gas run. In a leasehold flat either route needs the freeholder's consent. We settle this before the layout is fixed.

What ventilation will building control expect in the new kitchen?

Building regulations set the background and extract ventilation a kitchen must provide, which is why the hob position, the duct route and the window or rooflight design are decided together rather than treated as a late services addition. Where a gas appliance is retained or relocated, combustion-ventilation requirements apply as well, so the specification is settled at drawing stage rather than on site.

Does my kitchen extension need listed building consent?

If the building is listed — which is common in Kensington — then very likely, and the control extends inside. Cutting a duct route through historic fabric, removing a chimneybreast to gain a run of units or altering original joinery can each require consent alongside planning permission. The listing and its extent must be confirmed for the exact address before any layout is committed.

How much does a kitchen extension in Kensington cost?

Architect fees depend on the scope, the property and the consent route — a rear kitchen extension to a house and a kitchen relocation inside a mansion flat needing a Licence to Alter are very different pieces of work. Our published packages start from a fixed fee, confirmed once the scope is clear and set out on our packages page. They exclude council and Planning Portal charges, structural engineering, party wall surveying and specialist reports.

Planning a kitchen extension in Kensington?

Send us your Kensington address, a note on where the kitchen sits today and where you want it to go. We will confirm whether RBKC or your freeholder governs the route, test the extract, drainage and level constraints against the existing structure, and set out the drawings and approvals your kitchen will need — then confirm a fixed fee once the scope is clear.

Call 020 8054 8756Send Details