A St John’s Wood rear extension can involve a villa plot where the mapped garden context is relevant to the proposal. Depth is not sold from a Hampstead closet-wing template.
The applicable council record and live map establish whether conservation considerations engage the site. We identify the legal building type first: dwellinghouse, converted property or managed apartment.
The complete address and application site decide whether Westminster or Camden policy, validation requirements, planning history and Article 4 records apply. We confirm those facts before selecting a council process.
For a mansion-block or lateral flat, the title, lease and landlord requirements decide whether a private alteration pack is needed for a rear terrace or conservatory-style proposal. That route is kept separate from planning.
Garden depth and mature planting can limit projection as much as the 45-degree amenity test. Sections show trees, levels and neighbour windows together.
For a qualifying dwellinghouse, we test the actual operation against every relevant GPDO limitation and condition, planning-history restriction and live Article 4 direction. Where the route is available we can prepare LDC drawings; otherwise we prepare the applicable planning package with complete elevations and sections.
Building regulations drawings cover structure, insulation and drainage after the envelope freezes. Where the actual work engages Party Wall procedures or landlord review, those separate timings are stated rather than inferred from the place-name or building type.
Compared with a Hampstead closet-wing terrace or a Highgate site, the useful distinction is not an assumed borough proportion. The complete St John’s Wood address, application site, legal building type and mapped records determine the route.
Related routes include house extension architects, Licence to Alter drawings for flats, and building regulations drawings.
A useful first pack is the address, lease notes if multi-unit, rear and garden photos, and a short brief. We will not freeze depth until authority and tenure are clear.
Delivery sequence: complete address and site → authority and legal building type → mapped controls and title or lease → survey → massing against relevant garden context → PD/LDC or planning → landlord consent if required → building regulations and tender.
Party Wall procedures and rights of light are separate, proposal-specific checks. We review the measured boundaries, neighbouring openings, foundations and proposed work before saying that either route engages.