The conversion type depends on the measured roof. Record the pitch, ridge, parapet, structure and usable volume before comparing rooflights, a dormer, hip-to-gable work or a mansard. Match the option to the host building and the verified consent route rather than assuming a particular St John's Wood typology.
Head height must be measured with the proposed floor, insulation and roof build-up included. The useful area, not a postcode rule of thumb, determines whether the space supports the intended room and compliant circulation. Record shallow zones and structural constraints before treating the roof as convertible.
Resolve the staircase at feasibility against the measured floor below and the applicable Building Regulations guidance. Its position can affect usable space, circulation and the fire strategy. A top-floor flat also requires title and lease checks to establish ownership of the roof void before design proceeds.
Develop the fire strategy for the actual building, height, storeys, layout and proposed use using current Building Regulations guidance and competent fire input where required. Do not prescribe a protected stair, door rating, suppression system or secondary escape from the neighbourhood or a generic storey description.
A structural engineer should design the roof alterations from the surveyed construction and load paths. Party Wall procedures apply only if the resulting work is notifiable under the Act; establish wall ownership, bearing details and the relevant adjoining owners before deciding that notices are needed.
If the site is within a mapped conservation area, explain how the proposed roof reads against the significance identified by the applicable Westminster or Camden appraisal. Set-backs, materials, visibility and host-building form are project evidence, not a guaranteed formula for approval.