The project may add floor area, reconfigure rooms or relocate a kitchen within the existing building. We define the actual scope from the measured property and legal building type, then test planning, structure, fire, acoustics, services, title and lease separately. A house or flat label alone does not establish an extension route or landlord-consent requirement.
Design ventilation from the current Building Regulations requirements and the measured building. A ducted system needs an appropriately sized route and external terminal; a recirculating system has different performance and maintenance limits. Any penetration, terminal or route through common or historic fabric must also be checked against structure, planning, listing and the actual lease where applicable.
Where the sink, dishwasher and any utility appliances land is a drainage question before it is a layout question. Moving a kitchen away from the wall carrying the existing soil stack means the waste has to travel further to reach it, and every extra metre has to be bought with fall — a gradient that must fit inside the floor zone you actually have. That zone is contested: insulation, a screed, underfloor-heating pipes and the waste runs all want the same depth, and in a new kitchen extension the finished floor level is pinned at both ends, meeting the existing floor inside and reaching a workable threshold to the garden outside. We set the build-up and the falls at the same time as the plan, because an island sink that cannot be drained is discovered on site, not on a mood board.
If the design removes or widens a wall, a structural engineer establishes the load path, permanent support, temporary works and foundations. Beam depth is coordinated with extract, lighting and ceiling services. Party Wall procedures apply only where the resulting wall work or excavation is notifiable under the Act; check ownership, neighbouring foundations and the designed work before assuming notices.
For a flat kitchen relocation, obtain the title and actual lease before fixing the layout. The documents decide the demise, ownership, covenants and any written landlord-consent or Licence to Alter route. Structure, acoustic separation, fire, common parts, waste and extract are then designed for the building, while any external change and listed-fabric effect follow their own public-consent tests.
For planning, identify the physical changes rather than the room use alone. The complete address selects Westminster or Camden, and the legal building type, operation, planning history, mapped designation and live directions decide whether permitted development or an application route applies. Where an application is needed, the authority assesses the rear elevation, neighbour daylight and garden context, plus the extract terminal, rooflights and any condenser or plant.
Finally, test the room against the current energy, ventilation and overheating requirements. The amount and specification of glazing follow a project-specific calculation and orientation study. Inside, door swings, circulation, appliance clearances, service routes and any island are checked against the measured plan rather than a standard kitchen formula.