A fabric-first upgrade order for an interwar house
These houses respond very well to a sequenced fabric upgrade, and the order matters because each measure changes what the next one is worth. Roof insulation first: heat loss upwards is the largest single element and access during a refurbishment is straightforward, so it is the best value. Cavity wall insulation second, subject to an inspection confirming the cavity is clean, the walls are sound and the exposure is suitable — it is not universally appropriate, and filling a cavity that is already partly obstructed or a wall in poor repair can cause damp rather than savings. Ground floor third: many interwar houses have an uninsulated solid floor, and either an insulated overlay, which raises levels and affects door heights, or breaking out and rebuilding, which is more disruptive but gives a better result, is worth doing while the house is empty. Airtightness fourth, sealing the obvious leakage paths at floor-to-wall junctions, service penetrations, unused chimney flues and around window frames, which costs little and removes the draughts that make a house feel colder than its heating implies. Ventilation runs alongside, because a tighter house needs controlled mechanical extract in wet rooms. Only after all of that does the heating system get sized, because sizing a boiler or heat pump for the house as it was rather than as it will be is how systems end up oversized and inefficient.