Costs · Process
What Affects the Cost of a House Refurbishment in London
Refurbishing an existing London home can cost as much as building new space, because so much of the value is hidden inside the existing envelope. This guide sets out what drives the price — from a cosmetic refresh to a full strip-out — without quoting a headline figure.
Why refurbishment cost is so hard to pin down
A refurbishment can mean almost anything, which is exactly why a single cost-per-square-metre figure is more likely to mislead than to help. Redecorating and re-carpeting a sound flat and stripping a period house back to brick and joist are both "refurbishment", yet they sit at opposite ends of the cost range. The reliable route to a real number is a defined scope, a design that resolves the work, and a competitive tender.
The particular trap with refurbishment is that much of the value is inside the existing envelope, where you cannot easily see it. You are not paying for a bigger footprint; you are paying to renew, upgrade and reconfigure what is already there — often in an occupied period building that resists tidy assumptions.
Our fixed-fee packages
Design fees, inc. VAT — separate from the council fees above
| Package | Fixed fee |
|---|---|
| Planning Route ReviewA paid route check before drawings or applications. | £395 inc. VAT |
| Standard Planning Drawings PackageFor straightforward householder schemes. | from £1,450–£1,950 inc. VAT |
| Full Householder Planning PackageDrawings plus application preparation and submission. | from £2,250–£3,250 inc. VAT |
| Licence to Alter / Flat Refurbishment Drawing PackLeasehold flat alterations and freeholder consent drawings. | from £1,500–£2,750 inc. VAT |
| Building Regulations / Technical Drawing PackageTechnical drawings once the planning route is clear. | from £2,750–£4,950 inc. VAT |
| Listed / Conservation Planning PackHeritage-led drawings and consent strategy. | Quoted after review |
Fixed fees quoted before you commit, credited from the £395 route review if you proceed. Larger, listed or complex projects are quoted after a paid review rather than sold at a fixed price. See all packages or find your package.
The extent of the works — cosmetic to full strip-out
The single biggest cost driver is how far back you go. It helps to think of refurbishment as a spectrum rather than one thing, because each step up multiplies the trades involved and the disruption caused:
- Cosmetic refresh — decoration, flooring, new sanitaryware or a kitchen swap, with the fabric and services left largely in place.
- Moderate refurbishment — new kitchen and bathrooms with associated first-fix, some replastering, joinery and a partial services upgrade.
- Full strip-out — back to brick and structure, with everything renewed: rewire, replumb, new heating, insulation, plaster, joinery and finishes throughout.
- Refurbishment plus reconfiguration — the above combined with moving walls, forming openings or altering the layout, which brings structural work into scope.
Renewing the services — rewire, heating and plumbing
In older London homes the services are frequently the hidden headline cost. A full rewire, a new or upgraded heating system, replumbing and a new consumer unit are substantial works in their own right, and they are hard to phase once walls and floors are open. Chasing cables and pipes into solid masonry, then making good, is labour-intensive and easy to underestimate.
Services renewal also carries knock-on decisions: whether to move a kitchen or bathroom (which relocates drainage and waste), whether to add underfloor heating (which affects floor build-ups and door levels), and how far to future-proof for electric vehicle charging or a heat pump. Each is reasonable; each has a cost.
Fabric, insulation and energy performance
A strip-out is often the one realistic chance to improve the fabric of an older home — insulation, draught-proofing, better glazing and, where appropriate, breathable build-ups suited to solid walls. This work rarely shows in the finished rooms, but it drives both cost and long-term comfort, and it is far cheaper to do while surfaces are already open than to retrofit later.
Period properties need care here rather than a standard specification. The wrong insulation strategy on a solid-wall building can trap moisture and cause damage, so the fabric approach should be designed, not assumed — particularly where the building is listed or in a conservation area.
Structural reconfiguration
The moment a refurbishment moves from renewing to rearranging, cost steps up. Removing a wall to open up a living space, forming a new opening, or altering the layout means structural design, beams and making good — and in older buildings it can uncover damp, decay or previous unauthorised alterations that must be put right once exposed.
Where the work affects a wall shared with a neighbour — common in London's terraces and converted houses — the Party Wall etc. Act may apply, adding surveyor costs and a notice period to the programme. This is a normal part of London work and should be budgeted from the outset rather than met as a surprise.
Period and heritage constraints
Much of prime London is period housing, and a great deal of it sits in a conservation area or is listed. That shapes both what you can do and what it costs. Repairing and matching original features — cornicing, sash windows, joinery, flooring — is more exacting than replacing them with modern equivalents, and specialist trades command specialist rates.
Where a building is listed, internal alterations that affect its character can require listed building consent. That consent carries no statutory application fee, but the drawings and heritage justification it needs make the process more involved, not less — and consent must be in place before the work is done. Purely internal refurbishment of an unlisted house usually needs no planning permission, but where a scheme also extends or alters the exterior, a householder application (statutory fee £548 from 1 April 2026) or a Lawful Development Certificate (£274) may be required. We always confirm the route before you commit.
Tenure — leasehold flats and the Licence to Alter
If you are refurbishing a flat, tenure is a cost and programme factor that owners of houses never meet. Most leases require the freeholder's formal consent — a Licence to Alter — before structural or significant works, and often before altering services, floors or layout. Obtaining it takes time and usually carries the freeholder's own surveyor and legal fees, which you are typically expected to pay.
Starting works without the required licence can breach the lease, so this is not a step to skip. It is far cheaper to establish what your lease requires early, and to programme the consent alongside the design, than to pause a strip-out mid-way while consent is negotiated.
Getting to a real number
Because refurbishment cost lives inside the existing building, the dependable route to certainty is a design that defines the scope — how far back you strip, which services you renew, what fabric work you do and where the layout changes — followed by a competitive tender on that scope. We start with a paid route review from £395, credited in full against your package if you proceed, and prepare a coordinated tender package so contractors price the same work and the quotes are genuinely comparable.
A sensible contingency matters more on refurbishment than on almost any other kind of project, because opening up an old building reveals what a survey alone cannot. Budgeting for the unforeseen from the start is not pessimism; it is how a refurbishment budget survives contact with the building.
Frequently asked questions
Why can a refurbishment cost as much as an extension?
What is the single biggest cost driver in a refurbishment?
Do I need planning permission to refurbish a house?
I'm refurbishing a flat — what is a Licence to Alter?
Should I improve insulation while I'm refurbishing?
How much contingency should I allow?
Can you tell me what my refurbishment will cost?
Explore further
Related services and areas
Related services
Need drawings or planning advice for your property?
Tell us the property address, type and what you are considering. We will advise the likely route — planning, building regulations, or both — and what information will be needed.