The opening move on a West Hampstead loft is to establish the legal building, proposed work and ownership evidence. Flats and buildings containing flats cannot use Schedule 2 Part 1. The executed lease and plan, rather than the apparent layout or area label, determine whether the roof void and affected structure are demised and whether written landlord consent is required.
Planning, landlord consent and Building Regulations are separate. Define the proposed work for the public-law route; use the executed lease and plan for any landlord-consent route. A shared measured base may support separate packages, but neither route determines the other or guarantees an outcome or programme.
Where mapped West End Green evidence applies, assess the proposed roof form against the measured host, actual public and neighbour viewpoints and the documented roof character. A neighbour's dormer or a street label does not transfer an outcome. Assess any roof-terrace proposal from its ownership evidence, visibility and measured overlooking relationship.
Survey the existing roof, load paths and affected structure rather than inferring them from age, conversion history or NW6. Define any acoustic and fire-separation requirements from the legal building and actual work, and check beam bearings against the Party Wall Act only where the defined work engages it.
Adding a habitable storey can change the applicable fire and escape strategy. Define the legal building, layout and proposed work, then identify the current Building Regulations evidence; no single protected-route or upgrade specification follows from the West Hampstead, maisonette or loft label.
Where measurement confirms railway or other noise exposure at the subject roof, the ventilation strategy should not rely on an open rooflight without testing the consequences. Glazing, background or mechanical ventilation and overheating evidence then belongs in the technical package; proximity alone does not prove that every loft needs it. Our route separates tenure and roof ownership, the mapped planning position, measured survey, any landlord consent and Building Regulations information. We do not promise approval or timing.